Lewis Run Substation

Named in 3 PJM planning documents for 1 project, from March 4, 2025 to October 8, 2025.

Existingdescribed as
PENELECzone
230 kVkV as printed
3mentions

Also printed as: Lewis Run

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Glade Substation
PN-2024-013 · s3631.1
Not printed $12 M 12/17/2027 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2025 RTEP p. 16
Glade Substation “At Lewis Run Substation, on the Glade line terminal: ▪ Replace line trap. ▪ Install new relaying and control equipment.”
230 kV
2025-10-08 TEAC
Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 16
Glade Substation “At Lewis Run Substation, on the Glade line terminal: § Replace line trap.”
2025-03-04 TEAC
Item 07 - Penelec Supplemental Projects p. 4
Glade Substation “At Lewis Run Substation, on the Glade line terminal: -Replace line trap”