Buzzard Point
Named in 1 PJM planning document for 2 projects, on Not reported.
Existingdescribed as
PEPCOzone
138kVkV as printed
2mentions
Also printed as: Buzzard Point substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Buzzard Point 7TS Breaker Replacement PEP-2023-006 · s3203.1 |
Engineering | $675k | 12/1/2024 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| Buzzard Point 13B & 14B Breaker Replacements PEP-2024-001 · s3312.1 |
Engineering | $300k | 12/31/2024 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 7 |
Buzzard Point 7TS Breaker Replacement | “138kV circuit breaker 7TS at Buzzard Point substation was installed in 1972” 138kV |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 9 |
Buzzard Point 13B & 14B Breaker Replacements | “Replace the existing 138kV oil circuit breakers 13B & 14B at Buzzard Point.” 138kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.