Browse substations
Every substation with a page on Substation Scout, in one list: the substations named in the generation interconnection queues this site publishes, and those named in transmission planning records (PJM, ERCOT, MISO, Georgia, Arizona, Nevada and Kentucky). Filter by name, state, county, utility or source.
Queue data as of 2026-11-23. PJM planning materials through 2026-11-23; ERCOT TPIT release of 2026-10-01. 276 PJM substations appear in both the queue and the planning materials and are listed once.
Find a substation
Loading…
| Substation | Region | County | Utility or zone | kV | Generation queue | Planning materials |
|---|
What is listed
Each row is a substation this site already has a page for. Each row links to the page for every source that names it:
- Generation queues. Substations named as the point of interconnection in the PJM, ERCOT and BPA interconnection queues, tracked weekly, and in the annual snapshots of the MISO, SPP, Southern Company, Duke Energy, TVA, APS and LG&E and KU queues (requests through 2025). The queue column shows how many requests name the substation, how many are still active, and their active megawatts.
- Planning records. Substations named in PJM's TEAC and Sub-Regional RTEP materials, ERCOT's Transmission Project and Information Tracking workbook, MISO's Transmission Expansion Plan, and the state sections for Georgia, Arizona, Nevada and Kentucky, from the Substation Expansion Tracker. The planning column shows how many projects name the substation, and whether a record describes it as new or as getting an expansion.
This is not a list of every substation in the country. A substation that no queue request and no planning document names is not here.
Why a substation can appear twice
The sources do not share an identifier, and they spell names differently. Two rows are combined only where this site already links them: a PJM substation in the planning materials and a PJM queue substation with the same name and either the same transmission owner or, more weakly, the same state. Both pages show that link and say which kind it is. It is not verified as the same facility. Everything else stays a separate row, so one physical substation can appear once per source, and two different substations with the same name appear separately. A wrong match would put one substation's records on another's row, so the list does not guess.
Fields left blank
A field is blank when the source does not report it, and it is not filled in from elsewhere.
- State and county. PJM planning materials name a substation and a transmission zone, not a state or county, so most PJM planning rows have neither. Those rows can still be found by name or by zone. Queue rows take their counties from the requests that name the substation, so a substation can list more than one.
- Utility or zone. For PJM planning rows this is the transmission zone of the document that names the substation. For ERCOT planning rows it is the transmission service provider the workbook lists. BPA rows show BPA, whose queue is for its own transmission system. For PJM queue rows it is the transmission owner PJM records on the requests, spelled as PJM spells it there, which can differ from the zone abbreviation (Dominion and DOM, for example). PJM records an owner on its newer cycle filings, not on older serial filings. ERCOT's queue names the interconnecting developer, not a utility, so ERCOT queue rows are blank.
- kV. Voltages as printed in the planning materials and the voltage of each queue request's point of interconnection.
Source
Each row's figures come from the pages it links to, which cite their own documents and retrieval dates. The full list is available as JSON at /data/substations.json, rebuilt each time the site's data is refreshed.