Juniata

Named in 8 PJM planning documents for 6 projects, from November 6, 2024 to December 8, 2025.

Existingdescribed as
PPLzone
500 kV, 500/230 kV, 500kVkV as printed
8mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Baseline
b3909.1
Not printed $22.2 M 3/30/2029 Not printed 2024-12-03
TEAC
PPL Transmission Zone: Baseline MAAC PPL Cluster
b4029.1
Not printed $565.4M 6/1/2030 Not printed 2025-12-08
TEAC
PPL-2024-0001 Conceptual $244M s3311.1, s3311.3, s3311.4, s3311.5, s3311.6. RIS 6/30/2026. s3311.2 RIS 6/1/2027 1,275 MW 2026-09-08*
SRRTEP Mid-Atlantic
New Buffalo, PA
PPL-2024-0017 · s3571
Conceptual $242 M 05/30/2028 1,000 MW 2025-10-08
TEAC
PPL Transmission Zone: Baseline
2024-W1-935
Not printed Not printed 6/1/2029 Not printed 2024-11-06
TEAC
MAAC PPL Cluster
2025-W1-558
Not printed $565.4M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2024-11-06 2025-01-07

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 29
PPL-2024-0001 “from Juniata substation to Bernheisel substation”
500kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 29
New Buffalo, PA No role wording
500kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 28
PPL Transmission Zone: Baseline MAAC PPL Cluster No role wording
500 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 54
MAAC PPL Cluster No role wording
500 kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 29
New Buffalo, PA “Juniata substation”
500kV
2025-01-07 TEAC
Item 07 - PPL Supplemental Projects p. 4
New Buffalo, PA “from Juniata substation to New Buffalo substation”
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 49
PPL Transmission Zone: Baseline “Juniata 500 kV yard expansion/reconfiguration”
500 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 50
PPL Transmission Zone: Baseline “Juniata 500 kV yard expansion/reconfiguration”
500/230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.