Substation Scout

North Meshoppen

Named in 2 PJM planning documents for 1 project, from November 13, 2025 to September 17, 2026.

Existingdescribed as
PENELECzone
115 kVkV as printed
2mentions

Also printed as: North Meshoppen Substation

PJM interconnection queue

A PJM queue substation page has the same name: North Meshoppen (PA) — 2 queue requests filed, 2 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
East Towanda - North Meshoppen 115 kV Line – Customer Connection
PN-2025-008
Conceptual $16.00 M 07/20/2029 Not printed 2026-09-17
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/31/2026 → 07/20/2029 2025-11-13 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-09-17 SRRTEP Mid-Atlantic
Item 03 - Penelec Supplemental Projects p. 4
East Towanda - North Meshoppen 115 kV Line – Customer Connection “Adjust relay settings at East Towanda and North Meshoppen substations.”
2025-11-13 SRRTEP Mid-Atlantic
Item 05 - Penelec Supplemental Projects p. 3
East Towanda - North Meshoppen 115 kV Line – Customer Connection No role wording
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this