Reid
Named in 3 PJM planning documents for 4 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
5mentions
Also printed as: Reid Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Misoperation Relay Projects APS-2023-023, APS-2023-024, APS-2023-025 |
Not printed | $3.2 M | 11/17/2023 | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2023-024 · s3101.1 |
Not printed | $2.8 M | 05/15/2024 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-039, APS-2024-041 to APS-2024-045, APS-2024-048 to APS-2024-051 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| New Customer Connection APS-2026-078 |
Not printed | Not printed | 1/1/2028 | approximately 200 MW | 2026-10-16 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | PARKERSBURG; TRISSLER → GARRETT; GUILFORD; PARKERSBURG; REID; RIDGELEY; TRISSLER | 2024-10-08 | Not reported |
| Substations named | ANTIETAM; BACK FORK; BEDINGTON; CANAAN VALLEY; COWEN; CRUPPERNECK; DOUBLE TOLL GATE; EAST HAGERSTOWN; GLENVILLE; GREENWOOD; NIPETOWN; PARAMOUNT; REDBUD; REID; RINGGOLD; SENECA CAVERNS; SHAFFERS CORNER; SHAFFERS CORNERS; SPRINGDALE; WESTON; WILLIAM → ANTIETAM; BACK FORK; BEDINGTON; CANAAN VALLEY; COWEN; CRUPPERNECK; DOUBLE TOLL GATE; EAST HAGERSTOWN; GLENVILLE; GREENWOOD; NIPETOWN; PARAMOUNT; REDBUD; REID; RINGGOLD; SENECA CAVERNS; SHAFFERS CORNER; SPRINGDALE; WESTON; WILLIAM | 2024-10-08 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 10 |
New Customer Connection | No role wording 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 127 |
Misoperation Relay Projects | “replace circuit breaker, line trap, substation conductor and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 41 |
Misoperation Relay Projects | “At Reid Substation, replace wave trap, disconnect switches, substation conductor, & relaying” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 127 |
Misoperation Relay Projects | “At Reid, replace circuit breaker, line trap, substation conductor and relaying.” |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 41 |
Misoperation Relay Projects | “At Reid Substation, replace wave trap, disconnect switches,
substation conductor, & relaying” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.