Timber Switch

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
AEPzone
—kV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Timber Switch (OH) — 3 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Haviland-Van Wert Rebuild
AEP-2022-OH043, AEP-2023-OH065 · s3142.1-.5
Conceptual $32.57M 1/1/2026 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 34
Haviland-Van Wert Rebuild “Upgrade telecom equipment at South Van Wert, Logtown, Maddox Creek, Timber Switch and North Delphos stations”
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 34
Haviland-Van Wert Rebuild “Upgrade telecom equipment at South Van Wert, Logtown, Maddox Creek, Timber Switch and North Delphos stations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.