Mentions: June 2025
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-06-13 | SRRTEP Western Item 01 - EKPC Supplemental Projects p. 3 |
Shelby County, KY EKPC-2025-004 |
Shelby Co | Load 48 MW |
| 2025-06-13 | SRRTEP Western Item 01 - EKPC Supplemental Projects p. 5 |
Shelby County, KY EKPC-2025-003 |
Logistics Dr #2 New Shelby Co Shelby County |
Status Engineering Cost $0 M In service 06/01/2026 Load 57 MW |
| 2025-06-13 | SRRTEP Western Item 02 - AEP Supplemental Projects p. 3 |
Mink, OH AEP-2025-OH008 |
Mink station | In service 12/1/2026 Load 25 MW |
| 2025-06-13 | SRRTEP Western Item 02 - AEP Supplemental Projects p. 5 |
Badger, OH AEP-2025-OH005 |
Badger Jug St |
Status Engineering Cost $0 In service 07/01/2026 Load 279 MW |
| 2025-06-13 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 3 |
ComEd-2025-006 | Channahon Morris CoGen tap |
No figures printed |
| 2025-06-13 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 4 |
ComEd-2025-007 | Mazon Morris CoGen tap |
No figures printed |
| 2025-06-13 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 6 |
Customer Expansion in Chicago ComEd-2025-004 |
station Y764-2 | Status Engineering Cost $0M In service 12/31/27 Load 52 MW |
| 2025-06-13 | SRRTEP Western Item 04 - AMPT Supplemental Projects p. 3 |
Bowling Green 3, OH AMPT-2025-003 |
Gypsy Lane Sub #3 Gypsy Lane |
No figures printed |
| 2025-06-13 | SRRTEP Western Item 04 - AMPT Supplemental Projects p. 4 |
Bowling Green 2, OH AMPT-2025-004 |
Poe Road Tontogany |
No figures printed |
| 2025-06-13 | SRRTEP Western Item 04 - AMPT Supplemental Projects p. 5 |
Niles Central, OH AMPT-2025-005 |
Niles Central | Load 63 MW |
| 2025-06-13 | SRRTEP Western Item 05 - ATSI Supplemental Projects p. 3 |
Campbellsport – Ravenna No. 2 69 kV Line ATSI-2022-029 |
Campbellsport Collins Ravenna West Ravenna |
Status Conceptual Cost $6.77M In service 5/26/2026 |
| 2025-06-13 | SRRTEP Western Item 05 - ATSI Supplemental Projects p. 5 |
Black River – Johnson West 69 kV Line ATSI-2025-011 |
Black River Johnson West Oakwood Tap Shalmet Tap |
Status Conceptual Cost $1.66M In service 12/31/2026 |
| 2025-06-13 | SRRTEP Western Item 05 - ATSI Supplemental Projects p. 7 |
Gates – Johnson 138 kV Line ATSI-2025-015 |
Gates Johnson Johnson substations Murray |
Status Conceptual Cost $1.96M In service 12/29/2028 |
| 2025-06-13 | SRRTEP Western Item 06 - APS Supplemental Projects p. 3 |
Misoperation Relay Projects APS-2024-098 to APS-2024-100, APS-2025-015 |
Bethel Park Substation Carnegie Cherry Run Harwick Houseville Substation McConnellsburg St Clair Tidd Warfordsburg Weirton Substation |
Status Conceptual |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 3 |
Briant Park – Traynor 34.5 kV I35 Line Customer Connection JCPL-2025-002 |
Briant Park Morris Court Substation Traynor |
Status Conceptual Cost $0.50 In service 8/31/2025 Load 5 MVA |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 02 - MetEd Supplemental Projects p. 3 |
Cly – Smith Street 115 kV 978 Line Customer Connection ME-2024-017 |
Cly Smith Street |
Status Conceptual Cost $4.71 In service 5/1/2028 |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 03 - Penelec Supplemental Projects p. 3 |
Raystown, PA PN-2025-003 |
None named | No figures printed |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental Mount Carmel, PA PPL-2025-0011 |
None named | Load 4MVA |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 4 |
PPL Transmission Zone: Supplemental Frackville/Hauto, PA PPL-2019-0004 |
Frackville Hauto |
No figures printed |
| 2025-06-05 | TEAC Item 04 - Penelec Supplemental Projects p. 3 |
Shelocta Substation PN-2025-002 |
Shelocta | No figures printed |
| 2025-06-05 | TEAC Item 05 - PPL Supplemental Projects p. 3 |
Callender Gap, PA PPL-2025-0005 |
Callender Gap New Hopatcong Lackawanna Paupack |
Status Conceptual Cost $73.5 M In service 05/30/2028 Load 500MW |
| 2025-06-05 | TEAC Item 05 - PPL Supplemental Projects p. 5 |
Orefield, PA PPL-2025-0006 |
Alburtis Allentown Orefield New Siegfried Susquehanna Wescosville |
Status Conceptual Cost $159 M In service 05/30/2028 Load 1000 MW |
| 2025-06-05 | TEAC Item 05 - PPL Supplemental Projects p. 7 |
Highspire, PA PPL-2025-0007 |
Highspire New Hummelstown Steelton |
Status Conceptual Cost $89 M In service 05/30/2028 Load 450 MW |
| 2025-06-05 | TEAC Item 05 - PPL Supplemental Projects p. 9 |
Black Creek, PA PPL-2025-0009 |
Tomhicken | Status Conceptual Cost $13.5 M In service 05/30/2027 Load 500 MW |
| 2025-06-05 | TEAC Item 06 - PECO Supplemental Projects p. 3 |
Forge Spring Substation PE-2025-001 |
Barbadoes Betzwood Forge Spring Substation New |
Status Conceptual Cost $27M In service 12/31/2029 |
| 2025-06-05 | TEAC Item 07 - PEPCO Supplemental Projects p. 3 |
PEPCO Transmission Zone M-3 Process
PEPCO PEP-2025-003 |
F street Georgetown I street L street |
No figures printed |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental
Operational Flexibility and Efficiency DOM-2025-0028 |
North Anna | No figures printed |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental
Equipment Material Condition, Performance and Risk DOM-2025-0026 |
Chesterfield Chickahominy Ladysmith Lanexa Possum Point Providence Forge Turner |
No figures printed |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 6 |
Dominion Transmission Zone: Supplemental
Tributary 230kV Delivery - REC DOM-2024-0009 |
Ladysmith CT New Post Tributary New |
Status Engineering Cost $32.3M In service 04/01/2027 Load 108 MW |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 8 |
Dominion Transmission Zone: Supplemental
South Fork 230kV Delivery - NOVEC DOM-2023-0002 |
Loudoun Racefield Reed Farm New |
Status Engineering Cost $19.0M In service 09/30/2026 Load 162.0 MW |
| 2025-06-05 | TEAC Item 08 - DOM Supplemental Projects p. 10 |
Dominion Transmission Zone: Supplemental
Operational Flexibility and Efficiency DOM-2024-0051 |
Chickahominy Elmont Four Rivers Fredericksburg Kraken Ladysmith CT St. Johns Summit |
Status Conceptual Cost Transmission: $108M; Substation: $15M In service 12/31/2030 |
| 2025-06-05 | TEAC Item 09 - Reliability Analysis Update p. 50 |
2024 W1 Regional Cluster Additional Scope b4000.14 |
502 Junction Black Oak Woodside |
Cost $3.0 M In service 12/31/2031 |
| 2025-06-05 | TEAC Item 09 - Reliability Analysis Update p. 51 |
2024 W1 Regional Cluster: Baseline b4000.6 Project Update b4000.6 |
Amos Rocky Point Welton Spring |
Cost $353.5 M In service 6/1/2029 |
| 2025-06-05 | TEAC Item 09 - Reliability Analysis Update p. 55 |
Untitled project | None named | Cost $3.35M In service 6/1/2029 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.