Substation Scout

Albright Substation

Named in 6 PJM planning documents for 5 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
9mentions

Also printed as: Albright

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Projects
APS-2023-018 · s3097.1
Not printed $1.3 M 12/1/2025 Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2023-064 to APS-2023-066, APS-2023-069
Not printed $1.7 06/01/2024 Not printed 2026-09-08*
SRRTEP Western
Misoperation Relay Projects
APS-2023-066 · s3160.1
Not printed $3.9 10/09/2024 Not printed 2024-10-08
TEAC
Albright Substation
APS-2024-072 · s3645.1
Not printed $1.69 M 08/20/2029 Not printed 2025-10-08
TEAC
Albright - Pruntytown 138 kV Line
APS-2026-014
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALBRIGHT; BRANDONVILLE JUNCTION; HAZELTON; LAKE LYNN → ALBRIGHT; FAIRVIEW; GLEN FALLS; GRASSY FALLS; HAZELTON; LAKE LYNN 2024-10-08 Not reported
Substations named ALBRIGHT; KINGWOOD; PRUNTYTOWN → ALBRIGHT; FAWN; GOBAIN; KINGWOOD; PRUNTYTOWN 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Western
Item 01 - APS Supplemental Projects Presentation p. 3
Albright - Pruntytown 138 kV Line No role wording
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 38
Misoperation Relay Projects “At Albright Substation, replace wave trap, substation conductor, & relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 62
Misoperation Relay Projects “At Albright Substation, replace disconnect switches, line trap, substation conductor and relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 62
Misoperation Relay Projects “At Albright Substation, replace disconnect switches, line trap, substation conductor and relaying”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 33
Albright Substation “Albright Substation: At Albright, replace circuit breaker”
138 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 33
Albright Substation “At Albright, replace circuit breaker, disconnect switches, wave trap, and relaying.”
138 kV
2025-02-14 SRRTEP Western
Item 04 - APS Supplemental Projects p. 13
Albright Substation “At Albright, replace circuit breaker, disconnect switches, wave trap, and relaying.”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 38
Misoperation Relay Projects “At Albright Substation, replace wave trap, substation conductor, & relaying”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 62
Misoperation Relay Projects “At Albright Substation, replace disconnect switches, line trap, substation conductor and relaying”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.