Lombard
Named in 7 PJM planning documents for 4 projects, from January 17, 2025 to October 6, 2026.
Existingdescribed as
COMEDzone
138 kV, 345 kV, 345kVkV as printed
13mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Customer in Elk Grove ComEd-2023-008 · s3582.1, s3582.2 |
Engineering | $158M | 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) | 378 MW | 2025-10-08 TEAC |
| 138 kV L10301 Wave Trap at Lombard ComEd-2025-001 · s3727.1 |
In service | $ 0.15 M | 12/31/2025 | Not printed | 2025-10-08 TEAC |
| 138 kV L10302 Wave Trap at Lombard ComEd-2025-002 · s3728.1 |
Conceptual | $ 0.15 M | 12/31/2027 | Not printed | 2025-10-08 TEAC |
| Lockport 345 kV BT 1-2 CB ComEd-2025-018 · s4008 |
Engineering | $2.2M | 12/31/2025 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | DES PLAINES; ELK GROVE; LOMBARD; ROLLING MEADOWS; SCHAUMBURG → DES PLAINES; ELK GROVE; LOMBARD; SCHAUMBURG | 2025-10-08 | Not reported |
| Status | engineering (Engineering) → in-service (In-Service) | 2025-02-14 | 2025-10-08 |
| Substations named | LOMBARD → LISLE; LOMBARD | 2025-01-17 | 2025-02-14 |
| Substations named | LOMBARD → LISLE; LOMBARD | 2025-01-17 | 2025-02-14 |
| Substations named | LOCKPORT → LOCKPORT; LOMBARD | 2025-09-09 | 2025-10-08 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 13 |
Lockport 345 kV BT 1-2 CB | No role wording 345 kV |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 13 |
Lockport 345 kV BT 1-2 CB | No role wording 345 kV |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 12 |
Customer in Elk Grove | No role wording 345kV |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 30 |
138 kV L10301 Wave Trap at Lombard | “Upgrade wave trap on 138 kV Lombard – Lisle line L10301” 138 kV |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 32 |
138 kV L10302 Wave Trap at Lombard | “Upgrade wave trap on 138 kV Lombard – Lisle line L10302” 138 kV |
| 2025-10-08 | TEAC Item 11 - ComEd Supplemental Projects p. 6 |
Lockport 345 kV BT 1-2 CB | No role wording 345 kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Customer in Elk Grove | No role wording 345kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 31 |
138 kV L10301 Wave Trap at Lombard | “Upgrade wave trap on 138 kV Lombard – Lisle line L10301” 138 kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 33 |
138 kV L10302 Wave Trap at Lombard | “Upgrade wave trap on 138 kV Lombard – Lisle line L10302” 138 kV |
| 2025-02-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 5 |
138 kV L10301 Wave Trap at Lombard | “Upgrade wave trap on 138 kV Lombard – Lisle line L10301” 138 kV |
| 2025-02-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 7 |
138 kV L10302 Wave Trap at Lombard | “Upgrade wave trap on 138 kV Lombard – Lisle line L10302” 138 kV |
| 2025-01-17 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 3 |
138 kV L10301 Wave Trap at Lombard | “wavetrap at Lombard is over its rated fault current” 138 kV |
| 2025-01-17 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 4 |
138 kV L10302 Wave Trap at Lombard | “wavetrap at Lombard is over its rated fault current” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.