Substation Scout

Lombard

Named in 7 PJM planning documents for 4 projects, from January 17, 2025 to October 6, 2026.

Existingdescribed as
COMEDzone
138 kV, 345 kV, 345kVkV as printed
13mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Elk Grove
ComEd-2023-008 · s3582.1, s3582.2
Engineering $158M 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) 378 MW 2025-10-08
TEAC
138 kV L10301 Wave Trap at Lombard
ComEd-2025-001 · s3727.1
In service $ 0.15 M 12/31/2025 Not printed 2025-10-08
TEAC
138 kV L10302 Wave Trap at Lombard
ComEd-2025-002 · s3728.1
Conceptual $ 0.15 M 12/31/2027 Not printed 2025-10-08
TEAC
Lockport 345 kV BT 1-2 CB
ComEd-2025-018 · s4008
Engineering $2.2M 12/31/2025 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DES PLAINES; ELK GROVE; LOMBARD; ROLLING MEADOWS; SCHAUMBURG → DES PLAINES; ELK GROVE; LOMBARD; SCHAUMBURG 2025-10-08 Not reported
Status engineering (Engineering) → in-service (In-Service) 2025-02-14 2025-10-08
Substations named LOMBARD → LISLE; LOMBARD 2025-01-17 2025-02-14
Substations named LOMBARD → LISLE; LOMBARD 2025-01-17 2025-02-14
Substations named LOCKPORT → LOCKPORT; LOMBARD 2025-09-09 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 13
Lockport 345 kV BT 1-2 CB No role wording
345 kV
2026-09-30* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2026 RTEP p. 13
Lockport 345 kV BT 1-2 CB No role wording
345 kV
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 12
Customer in Elk Grove No role wording
345kV
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 30
138 kV L10301 Wave Trap at Lombard “Upgrade wave trap on 138 kV Lombard – Lisle line L10301”
138 kV
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 32
138 kV L10302 Wave Trap at Lombard “Upgrade wave trap on 138 kV Lombard – Lisle line L10302”
138 kV
2025-10-08 TEAC
Item 11 - ComEd Supplemental Projects p. 6
Lockport 345 kV BT 1-2 CB No role wording
345 kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 12
Customer in Elk Grove No role wording
345kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 31
138 kV L10301 Wave Trap at Lombard “Upgrade wave trap on 138 kV Lombard – Lisle line L10301”
138 kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 33
138 kV L10302 Wave Trap at Lombard “Upgrade wave trap on 138 kV Lombard – Lisle line L10302”
138 kV
2025-02-14 SRRTEP Western
Item 03 - ComEd Supplemental Projects p. 5
138 kV L10301 Wave Trap at Lombard “Upgrade wave trap on 138 kV Lombard – Lisle line L10301”
138 kV
2025-02-14 SRRTEP Western
Item 03 - ComEd Supplemental Projects p. 7
138 kV L10302 Wave Trap at Lombard “Upgrade wave trap on 138 kV Lombard – Lisle line L10302”
138 kV
2025-01-17 SRRTEP Western
Item 03 - ComEd Supplemental Projects p. 3
138 kV L10301 Wave Trap at Lombard “wavetrap at Lombard is over its rated fault current”
138 kV
2025-01-17 SRRTEP Western
Item 03 - ComEd Supplemental Projects p. 4
138 kV L10302 Wave Trap at Lombard “wavetrap at Lombard is over its rated fault current”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this