Sunbury

Named in 14 PJM planning documents for 11 projects, from November 14, 2024 to October 6, 2026.

Existingdescribed as
PPLzone
230kV, 500 kV, 500kV, 69kVkV as printed
22mentions

PJM interconnection queue

A PJM queue substation page has the same name: Sunbury (PA) — 10 queue requests filed, 5 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Baseline MAAC PPL Cluster
b4029.1
Not printed $565.4M 6/1/2030 Not printed 2025-12-08
TEAC
Beavertown, PA
PPL-2019-0003 · s3554.1
Conceptual $33 M 05/31/2028 Not printed 2025-10-08
TEAC
PPL-2023-0007 Conceptual $103M 12/30/2028 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Harwood, PA
PPL-2024-0003
Conceptual $195.55 M 06/01/2027 1,980 MW 2026-10-06
TEAC
Susquehanna, PA
PPL-2025-0003 · s3706
Not printed $19.4 M 05/30/2028 1,440 MW 2025-10-08
TEAC
Gordon, PA
PPL-2025-0008
Conceptual $231.65 M 05/30/2028 600MW 2026-10-06
TEAC
Mausdale, PA
PPL-2025-0030
Engineering $3.6 M 03/30/2028 Not printed 2026-10-06
TEAC
Nescopeck, PA
PPL-2026-0004
Conceptual $130.6 M 05/30/2029 1,350 MW 2026-05-08
TEAC
Natalie 500-230kV Substation
PPL-2026-0029
Conceptual $408 M 12/30/2029 2,000 MW 2026-09-08
TEAC
Elimsport 230kV Lines
PPL-2026-0031
Conceptual $158.5 M 05/30/2029 300 MW 2026-10-06
TEAC
MAAC PPL Cluster
2025-W1-558
Not printed $565.4M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BEAVERTOWN → BEAVERTOWN; MIDDLEBURG; SUNBURY 2024-10-17 2024-11-14
Cost estimate $196.55 M → $195.55 M Not reported Not reported
Cost estimate $195.55 M → $196.55 M 2026-10-06 Not reported
Cost estimate $197.55 M → $195.55 M 2025-05-06 2026-10-06
In-service date 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 → 06/01/2027 Not reported Not reported
In-service date 06/01/2027 → 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 2026-10-06 Not reported
Status unknown (Development) → conceptual (Conceptual) 2025-05-06 2026-10-06
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN Not reported Not reported
Substations named HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN → GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN 2026-10-06 Not reported
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN 2025-05-06 2026-10-06
In-service date 04/2026 → 05/30/2028 2025-04-01 2025-05-06
In-service date 05/2027 → 5/30/2027 2025-05-06 2025-10-08
In-service date 5/30/2027 → 05/30/2028 2025-10-08 2026-10-06
In-service date 3/2028 → 03/30/2028 2025-12-11 2026-02-12
Substations named MAUSDALE → COLUMBIA; MAUSDALE; SUNBURY 2025-12-11 2026-02-12
In-service date 10/2028 → 05/30/2029 2026-03-10 2026-05-08
In-service date 06/2028 → 12/30/2029 2026-04-07 2026-09-08
In-service date 06/2028 → 05/30/2029 2026-04-07 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 12 - PPL Supplemental Projects - Presentation p. 6
Elimsport 230kV Lines “Sunbury 230kV Yard • Add terminal for a new 230kV line in the Sunbury 230kV GIS.”
230kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 13
Harwood, PA No role wording
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 25
Gordon, PA “Build out bay #2 in the 230kV GIS with two new breakers”
230kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 33
Mausdale, PA No role wording
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 13
Harwood, PA No role wording
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 25
Gordon, PA “Build out bay #2 in the 230kV GIS with two new breakers and associated equipment”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 33
Mausdale, PA No role wording
2026-09-08 TEAC
Item 07 - PPL Supplemental Projects p. 5
Natalie 500-230kV Substation No role wording
500kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 31
Harwood, PA No role wording
230kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 6
PPL-2023-0007 “Install new line terminals at Sunbury and Lock Haven substations to accommodate the new circuit.”
69kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 3
Beavertown, PA No role wording
69kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 33
Susquehanna, PA No role wording
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 14
Nescopeck, PA “Bifurcate Sunbury - Susquehanna 500kV line”
500kV
2026-02-12 SRRTEP Mid-Atlantic
Item 05 - PPL Supplemental Projects p. 18
Mausdale, PA “Sunbury 69kV Substation”
69kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 28
PPL Transmission Zone: Baseline MAAC PPL Cluster No role wording
500 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 54
MAAC PPL Cluster No role wording
500 kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 3
Beavertown, PA No role wording
69kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 33
Susquehanna, PA No role wording
230kV
2025-10-08 TEAC
Item 09 - PPL Supplemental Projects p. 6
Gordon, PA “Build out bay #2 in the 230kV GIS with two new breakers and associated equipment”
230kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 12
Harwood, PA No role wording
230kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 16
Susquehanna, PA No role wording
230kV
2024-11-14 SRRTEP Mid-Atlantic
Item 03 - PPL Supplemental Projects p. 7
Beavertown, PA No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this