Named in 3 PJM planning documents for 1 project, from November 15, 2024 to October 8, 2025.

Newdescribed as
AEPzone
138/13.8 kVkV as printed
3mentions

Described as new: “proposed Drew station” — source, page 14

Also printed as: Drew

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone M-3 Process Franklin, OH
AEP-2024-OH033 · s3593.1-.3
Conceptual $10.793 M 11/30/2026 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BEXLEY; DREW; ST CLAIR AVE → BEXLEY; DREW; ST CLAIR AVE STATIONS 2025-10-08 Not reported
Substations named BEXLEY; DREW; ST CLAIR; ST CLAIR AVE → BEXLEY; DREW; ST CLAIR AVE 2024-11-15 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2025 RTEP p. 14
AEP Transmission Zone M-3 Process Franklin, OH “proposed Drew station”
138/13.8 kV
2025-10-08 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 14
AEP Transmission Zone M-3 Process Franklin, OH “a new 138/13.8 kV station called Drew will be constructed”
138/13.8 kV
2024-11-15 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 8
AEP Transmission Zone M-3 Process Franklin, OH “a new 138/13.8 kV station called Drew will be constructed”
138/13.8 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.