Violet Hill
Named in 3 PJM planning documents for 3 projects, from October 8, 2024 to August 14, 2025.
Existingdescribed as
METEDzone
115 kV, 115-69 kV, 69 kVkV as printed
5mentions
Also printed as: Violet Hill Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Hokes Ring Bus ME-2023-003 · s3263.1 |
Not printed | $24.1M | 6/1/2025 | Not printed | 2024-10-08 TEAC |
| Violet Hill No. 6 115-69 kV Transformer ME-2024-003 · s3330.1 |
Not printed | $6.1M | 5/1/2028 | Not printed | 2024-10-08 TEAC |
| Violet Hill, PA ME-2025-002 |
Not printed | Not printed | Not printed | approximately 42 MW | 2025-08-14 SRRTEP Mid-Atlantic |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 17 |
Violet Hill No. 6 115-69 kV Transformer | “At Violet Hill Substation:
Replace the 115-69 kV Transformer #6 with a new 125 MVA transformer” 115-69 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 5 |
Hokes Ring Bus | No role wording 69 kV |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 05 - MetEd Supplemental Projects p. 3 |
Violet Hill, PA | No role wording 115 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 18 |
Violet Hill No. 6 115-69 kV Transformer | “At Violet Hill Substation:
§ Replace the 115-69 kV Transformer #6” 115-69 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 5 |
Hokes Ring Bus | No role wording 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.