French Creek
Named in 8 PJM planning documents for 5 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
9mentions
Also printed as: French Creek Substation · French Creek 138 kV Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Misoperation Relay Project APS-2021-007 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Project APS-2021-009 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118 |
Not printed | Not printed | Not printed | Not printed | 2024-12-13 SRRTEP Western |
| Misoperation Relay Projects APS-2024-114 · s3642.1, s3642.2 |
Not printed | $7.1 M | 03/30/2029 | Not printed | 2025-10-08 TEAC |
| French Creek - Sutton 138 kV Line APS-2026-012 |
Conceptual | $119.57 M | 05/06/2033 | Not printed | 2026-10-16 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BELMONT; FRENCH CREEK; JOHNS JCT; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER → BELMONT; FRENCH CREEK; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER | 2024-10-08 | Not reported |
| Substations named | FRENCH CREEK; HEATERS TAP; SUTTON → FRENCH CREEK; SUTTON | 2026-04-15 | 2026-10-16 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 14 |
French Creek - Sutton 138 kV Line | “At French Creek Substation: Remove wave trap, line turner and coax, and install fiber.” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 79 |
Misoperation Relay Project | “French Creek 138 kV Substation – Replace substation conductor, circuit breaker, and wave trap” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 27 |
Misoperation Relay Projects | “French Creek Substation: At French Creek, replace circuit breaker” 138 kV |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 8 |
French Creek - Sutton 138 kV Line | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 27 |
Misoperation Relay Projects | “At French Creek, replace circuit breaker, disconnect switch” 138 kV |
| 2025-02-14 | SRRTEP Western Item 04 - APS Supplemental Projects p. 7 |
Misoperation Relay Projects | “At French Creek, replace circuit breaker, disconnect switch, substation conductor, wave trap, line turner and coax, and relaying.” 138 kV |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 6 |
Misoperation Relay Projects | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 78 |
Misoperation Relay Project | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 79 |
Misoperation Relay Project | “French Creek 138 kV Substation – Replace substation conductor, circuit breaker, and wave trap” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.