Substation Scout

New Knoxville Delivery Point

Named in 1 PJM planning document for 1 project, on Not reported.

Newdescribed as
DAYTONzone
69 kVkV as printed
1mentions

Described as new: “Constructing three 69 kV MOAB switches with supervisory control, two with auto-sectionalizing capability, approximately 6.3 miles from the St. Marys substation to facilitate the New Knoxville Delivery Point” — source, page 7

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton DBA AES Ohio Transmission Zone M-3 Process
Dayton-2023-003 · S3752.1 - .3
Conceptual $ 43.2 M 10/2029 ~16MW 2026-09-30*
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 06/2027 → 10/2029 2025-09-19 2026-10-06
Substations named BOTKINS; ST MARYS → AMSTERDAM; BOTKINS; JACKSON CENTER; NEW KNOXVILLE DELIVERY POINT; ST MARYS 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-30* SRRTEP Western
Datyon local plan submission of the supplemental projects for 2026 RTEP p. 7
Dayton DBA AES Ohio Transmission Zone M-3 Process “Constructing three 69 kV MOAB switches with supervisory control, two with auto-sectionalizing capability, approximately 6.3 miles from the St. Marys substation to facilitate the New Knoxville Delivery Point”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.