Ocean Beach
Named in 4 PJM planning documents for 2 projects, from December 11, 2025 to October 6, 2026.
Not stateddescribed as
JCPLzone
34.5 kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Manitou 34.5 kV Submarine Cables JCPL-2025-012 · s3972.1 |
Not printed | $10.00M | 04/23/2029 | Not printed | 2026-10-06 TEAC |
| Manitou - Ocean Beach - Seaside Park D212 34.5 kV Line Rebuild JCPL-2026-009 |
Conceptual | $36.86 M | 02/11/2029 | Not printed | 2026-09-17 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | MANITOU; OCEAN BEACH; ORTLEY BEACH; SEASIDE PARK → ISLAND HEIGHTS TAP; MANITOU; OCEAN BEACH; ORTLEY BEACH; SEASIDE PARK; SEASIDE PARK 1 TAP; TOMS RIVER TAP | 2025-12-11 | 2026-07-17 |
| Substations named | ISLAND HEIGHTS TAP; MANITOU; OCEAN BEACH; ORTLEY BEACH; SEASIDE PARK; SEASIDE PARK 1 TAP; TOMS RIVER TAP → MANITOU; OCEAN BEACH; ORTLEY BEACH; SEASIDE PARK | 2026-07-17 | 2026-10-06 |
| Substations named | LAVALLETTE; MANITOU; ORTLEY BEACH; SEASIDE HEIGHTS; SEASIDE PARK; TOMS RIVER → LAVALLETTE; MANITOU; OCEAN BEACH; ORTLEY BEACH; SEASIDE HEIGHTS; SEASIDE PARK; TOMS RIVER | 2026-05-14 | 2026-09-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 46 |
Manitou 34.5 kV Submarine Cables | No role wording 34.5 kV |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 27 |
Manitou - Ocean Beach - Seaside Park D212 34.5 kV Line Rebuild | No role wording 34.5 kV |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 11 |
Manitou 34.5 kV Submarine Cables | No role wording 34.5 kV |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 7 |
Manitou 34.5 kV Submarine Cables | No role wording 34.5 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.