EH Werner
Named in 7 PJM planning documents for 4 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
JCPLzone
115-34.5 kV, 34.5 kVkV as printed
8mentions
Also printed as: EH Werner Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| EH Werner Substation JCPL-2023-037 · s3281.1 |
Not printed | $6.4M | 12/31/2024 | Not printed | 2024-10-08 TEAC |
| EH Werner- Freneau- Keyport 34.5 kV E31 Line JCPL-2024-012 · s3965.1 |
Not printed | $22.50 M | 05/11/2029 | Not printed | 2026-10-06 TEAC |
| EH Werner - Keyport 34.5 kV V48 Line Rebuild JCPL-2024-038 · s3971.1 |
Not printed | $42.10M | 04/05/2030 | Not printed | 2026-10-06 TEAC |
| Melrose Substation JCPL-2026-054 |
Not printed | Not printed | Not printed | Not printed | 2026-10-16 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | EH WERNER; FRENEAU; KEYPORT → FRENEAU; KEYPORT | 2026-10-06 | Not reported |
| Substations named | CLARK STREET; EH WERNER; FELTUS ST; FRENEAU; KEYPORT; LAURENCE HARBOR → EH WERNER; FRENEAU; KEYPORT | 2026-03-18 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 8 |
Melrose Substation | No role wording 34.5 kV |
| 2026-10-06 | TEAC Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 28 |
EH Werner- Freneau- Keyport 34.5 kV E31 Line | No role wording 34.5 kV |
| 2026-10-06 | TEAC Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 44 |
EH Werner - Keyport 34.5 kV V48 Line Rebuild | “upgrade relays at EH Werner and Keyport substations” 34.5 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic JCPL local plan submission for 2026 RTEP p. 45 |
EH Werner - Keyport 34.5 kV V48 Line Rebuild | “upgrade relays at EH Werner and Keyport substations.” |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 53 |
EH Werner Substation | “Replace the 115-34.5 kV No. 12 Transformer at EH Werner Substation” 115-34.5 kV |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 10 |
EH Werner - Keyport 34.5 kV V48 Line Rebuild | “upgrade relays at EH Werner and Keyport substations.” 34.5 kV |
| 2026-03-18 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects p. 9 |
EH Werner- Freneau- Keyport 34.5 kV E31 Line | No role wording 34.5 kV |
| 2024-10-08 | TEAC Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 53 |
EH Werner Substation | “Replace the 115-34.5 kV No. 12 Transformer at EH Werner Substation” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.