Pruntytown Substation
Named in 10 PJM planning documents for 15 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
APSzone
138 kV, 500 kV, 500/138 kVkV as printed
28mentions
Also printed as: Pruntytown
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Buckhannon-Pruntytown 138 kV New Customer APS-2021-012 · s3095.1 |
Not printed | $5.0M | 07/02/2025 | 40 MW | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2023-036, APS-2023-041 to APS-2023-043, APS-2023-045 to APS-2023-049 |
Not printed | $2.2 M | 11/29/2024 | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2023-047 · s3113.1 |
Not printed | $2.3 M | 12/19/2023 | Not printed | 2024-10-08 TEAC |
| Harrison – Pruntytown 500 kV Misoperation Relays APS-2023-056 · s3191.1 |
Not printed | $0.86M | 11/29/2024 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2023-064 to APS-2023-066, APS-2023-069 |
Not printed | $1.7 | 06/01/2024 | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2023-066 · s3160.1 |
Not printed | $3.9 | 10/09/2024 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-005, APS-2024-006 · s3464.1, s3465.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-012, APS-2024-017 · s3368.1, s3369.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Pruntytown No. 3 500/138 kV Transformer APS-2024-071 · s3574.1 |
Not printed | $15.77 M | 6/30/2029 | Not printed | 2025-10-08 TEAC |
| Pruntytown No. 1 500/138 kV Transformer APS-2024-077 · S3655.1 |
Not printed | $ 18.8 M | 06/13/2031 | Not printed | 2025-10-08 TEAC |
| Pruntytown No. 2 500/138 kV Transformer APS-2024-078 · S3653.1 |
Not printed | $ 18.8 M | 12/13/2030 | Not printed | 2025-10-08 TEAC |
| Misoperation Relay Projects APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118 |
Not printed | Not printed | Not printed | Not printed | 2024-12-13 SRRTEP Western |
| Misoperation Relays APS-2024-111 |
Conceptual | $4.73 M | 11/03/2028 | Not printed | 2026-09-18 SRRTEP Western |
| Misoperation Relays APS-2024-118 |
Conceptual | $6.51 M | 09/30/2026 | Not printed | 2026-09-18 SRRTEP Western |
| Albright - Pruntytown 138 kV Line APS-2026-014 |
Not printed | Not printed | Not printed | Not printed | 2026-10-16 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | FRANKLIN; PURSELY → ARMSTRONG; CABOT; EDGELAWN; FAIRVIEW; FRANKLIN; GILBOA; GRASSY FALLS; HOUSEVILLE; MCCALMONT; PRICE HILL; PRUNTYTOWN; PURSELY; SUTTON; TRISSLER | 2024-10-08 | Not reported |
| Substations named | ALBRIGHT; KINGWOOD; PRUNTYTOWN → ALBRIGHT; FAWN; GOBAIN; KINGWOOD; PRUNTYTOWN | 2024-10-08 | Not reported |
| Substations named | HARRISON; MT STORM DOM; PRUNTYTOWN; WYLIE RIDGE → HARRISON; PRUNTYTOWN; WYLIE RIDGE | 2024-10-08 | Not reported |
| Substations named | BUTLER; CABOT; CABOT WEST; GRAFTON; PRUNTYTOWN → BUTLER; CABOT; GRAFTON; PRUNTYTOWN | 2024-10-08 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 3 |
Albright - Pruntytown 138 kV Line | No role wording 138 kV |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 13 |
Misoperation Relays | “Pruntytown Substation - Replace wavetrap, meters, and relays” |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 9 |
Misoperation Relays | “At Pruntytown Substation: replace breaker, associated disconnect switches, substation conductor, wavetrap, and relays” |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 114 |
Misoperation Relay Projects | “At Pruntytown, replace line trap, disconnect switches, substation conductor and relaying” 500 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 33 |
Buckhannon-Pruntytown 138 kV New Customer | “Revise remote end relay settings at Buckhannon Substation and Pruntytown Substation” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 51 |
Misoperation Relay Projects | “At Pruntytown Substation, replace line trap and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 62 |
Misoperation Relay Projects | “At Pruntytown Substation, replace disconnect switches, line trap, substation conductor and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 62 |
Misoperation Relay Projects | “At Pruntytown Substation, replace disconnect switches, line trap, substation conductor and relaying” |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 69 |
Harrison – Pruntytown 500 kV Misoperation Relays | “Replace wave trap, line metering and relaying at Pruntytown Substation” 500 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 97 |
Misoperation Relay Projects | “At Pruntytown Substation, replace disconnect switches, line trap, substation conductor and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 11 |
Pruntytown No. 3 500/138 kV Transformer | “At Pruntytown Substation:
▪ Replace the existing 500/138 kV Transformer No. 3” 500/138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 39 |
Pruntytown No. 1 500/138 kV Transformer | “Replace No. 1 500/138 kV Transformer at Pruntytown Substation” 500/138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 41 |
Pruntytown No. 2 500/138 kV Transformer | “Replace No. 2 500/138 kV Transformer at Pruntytown Substation” 500/138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 11 |
Pruntytown No. 3 500/138 kV Transformer | “At Pruntytown Substation:
§ Replace the existing 500/138 kV Transformer No. 3” 500/138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 39 |
Pruntytown No. 1 500/138 kV Transformer | “Replace No. 1 500/138 kV Transformer at Pruntytown Substation” 500/138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 41 |
Pruntytown No. 2 500/138 kV Transformer | “Replace No. 2 500/138 kV Transformer at Pruntytown Substation” 500/138 kV |
| 2025-04-01 | TEAC Item 04 - APS Supplemental Projects p. 6 |
Pruntytown No. 1 500/138 kV Transformer | “Replace No. 1 500/138 kV Transformer at Pruntytown Substation” 500/138 kV |
| 2025-04-01 | TEAC Item 04 - APS Supplemental Projects p. 8 |
Pruntytown No. 2 500/138 kV Transformer | “Replace No. 2 500/138 kV Transformer at Pruntytown Substation” 500/138 kV |
| 2025-01-07 | TEAC Item 05 - APS Supplemental Project p. 4 |
Pruntytown No. 3 500/138 kV Transformer | “At Pruntytown Substation:
• Replace the existing 500/138 kV Transformer No. 3” 500/138 kV |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 6 |
Misoperation Relay Projects | No role wording 138 kV |
| 2024-12-03 | TEAC Item 04 - APS Supplemental Projects p. 4 |
Pruntytown No. 2 500/138 kV Transformer | “The Pruntytown No. 2 500/138 kV Transformer is approximately 56 years old and is approaching end of life.” 500/138 kV |
| 2024-12-03 | TEAC Item 04 - APS Supplemental Projects p. 5 |
Pruntytown No. 1 500/138 kV Transformer | “The Pruntytown No. 1 500/138 kV Transformer is approximately 54 years old and is approaching end of life.” 500/138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 114 |
Misoperation Relay Projects | “At Pruntytown, replace line trap, disconnect switches, substation conductor and relaying” 500 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 33 |
Buckhannon-Pruntytown 138 kV New Customer | “Revise remote end relay settings at Buckhannon Substation and Pruntytown
Substation” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 51 |
Misoperation Relay Projects | “At Pruntytown Substation, replace line trap and
relaying” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 62 |
Misoperation Relay Projects | “At Pruntytown Substation, replace
disconnect switches, line trap, substation
conductor and relaying” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 69 |
Harrison – Pruntytown 500 kV Misoperation Relays | “Replace wave trap, line metering and relaying at Pruntytown Substation” 500 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 97 |
Misoperation Relay Projects | “At Pruntytown Substation, replace disconnect switches, line trap, substation conductor and relaying” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.