Substation Scout

Glenside Substation

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
METEDzone
69 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Carpenter Technology – South Reading 69 kV Line
ME-2019-043 · s3288.1
Not printed $15.2M 05/29/2026 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 13
Carpenter Technology – South Reading 69 kV Line “At Glenside Substation:  Replace 69 kV motor-operated airbreak switches, disconnects and CCVTs”
69 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 14
Carpenter Technology – South Reading 69 kV Line “At Glenside Substation: § Replace 69 kV motor-operated airbreak switches”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this