Springdale

Named in 10 PJM planning documents for 7 projects, from October 8, 2024 to September 18, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
12mentions

Also printed as: Springdale Substation

PJM interconnection queue

A PJM queue substation page has the same name: Springdale (PA) — 4 queue requests filed, 2 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
APS Transmission Zone: Baseline 2024 RTEP Window 1
b3870
Not printed $0.69 M 06/01/2029 Not printed 2024-11-15
SRRTEP Western
APS Transmission Zone: Baseline 2024 RTEP Window 1 Not printed $0.69 M 06/01/2029 Not printed 2024-10-18
SRRTEP Western
Misoperation Relay Projects
APS-2023-075, APS-2023-079 to APS-2023-084, APS-2023-086, APS-2023-087 · s3194.1, s3195.1, s3196.1, s3197.1, s3198.1, s3199.1, s3200.1, s3201.1, s3202.1
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2024-039, APS-2024-041 to APS-2024-045, APS-2024-048 to APS-2024-051
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118
Not printed Not printed Not printed Not printed 2024-12-13
SRRTEP Western
Misoperation Relays
APS-2024-103
Conceptual $4.63 M 12/31/2029 Not printed 2026-09-18
SRRTEP Western
Huntingdon – Springdale 138 kV Line
APS-2025-006 · s3666.1
Not printed $4.71M 5/1/2028 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALL LUDLUM 4 JCT; ALLENPORT; ARMSTRONG; BRACKEN JCT; BREDINVILLE; BURMA; BUTLER; CABOT; CABREY JCT; CHARLEROI; DUPONT; EASTGATE T; EDGELAWN; FAIRVIEW; GRANT TOWN; LARKMEAD; LOYALHANNA; LUXOR; RIVESVILLE; SALTSBURG; SPRINGDALE; VANDERGRIFT; YOUNGWOOD; YUKON → BREDINVILLE; BUTLER; CABOT; SPRINGDALE 2024-10-08 Not reported
Substations named ANTIETAM; BACK FORK; BEDINGTON; CANAAN VALLEY; COWEN; CRUPPERNECK; DOUBLE TOLL GATE; EAST HAGERSTOWN; GLENVILLE; GREENWOOD; NIPETOWN; PARAMOUNT; REDBUD; REID; RINGGOLD; SENECA CAVERNS; SHAFFERS CORNER; SHAFFERS CORNERS; SPRINGDALE; WESTON; WILLIAM → ANTIETAM; BACK FORK; BEDINGTON; CANAAN VALLEY; COWEN; CRUPPERNECK; DOUBLE TOLL GATE; EAST HAGERSTOWN; GLENVILLE; GREENWOOD; NIPETOWN; PARAMOUNT; REDBUD; REID; RINGGOLD; SENECA CAVERNS; SHAFFERS CORNER; SPRINGDALE; WESTON; WILLIAM 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-18 SRRTEP Western
Item 01 - APS Supplemental Projects p. 7
Misoperation Relays “At Springdale Substation, replace wave trap, CVT and relaying”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 127
Misoperation Relay Projects “replace line trap, substation conductor and relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 72
Misoperation Relay Projects “At Springdale, replace relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 20
Huntingdon – Springdale 138 kV Line “At Springdale Substation, replace disconnect switches”
138 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 20
Huntingdon – Springdale 138 kV Line “At Springdale Substation, replace disconnect switches, substation conductor”
138 kV
2025-05-16 SRRTEP Western
Item 06 - APS Supplemental Project p. 7
Huntingdon – Springdale 138 kV Line “At Springdale Substation, replace disconnect switches”
138 kV
2025-03-14 SRRTEP Western
Item 07 - APS Supplemental Project p. 4
Huntingdon – Springdale 138 kV Line No role wording
138 kV
2024-12-13 SRRTEP Western
Item 15 - APS Supplemental Project p. 6
Misoperation Relay Projects No role wording
138 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 52
APS Transmission Zone: Baseline 2024 RTEP Window 1 No role wording
138 kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 3
APS Transmission Zone: Baseline 2024 RTEP Window 1 No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 127
Misoperation Relay Projects “At Springdale, replace line trap, substation conductor and relaying.”
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 72
Misoperation Relay Projects “At Springdale, replace relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.