Mentions: September 2025
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-09-19 | SRRTEP Western Item 01 - AMPT Supplemental Projects p. 3 |
Orrville 2nd Source AMPT-2023-004 |
Apple Ave Apple Ave subs E. Wooster East Wooster Mineral Springs New |
Status Engineering (AMPT), Conceptual (AEP and FE) Cost $71.7 M In service AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028) Load 60 MW |
| 2025-09-19 | SRRTEP Western Item 02 - APS Supplemental Projects p. 3 |
Bethel Park, PA APS-2025-026 |
Bethel Park Substation St Clair |
No figures printed |
| 2025-09-19 | SRRTEP Western Item 02 - APS Supplemental Projects p. 4 |
Kiski Valley, PA/North Washington, PA APS-2025-027 |
Kiski Valley North Washington |
In service 6/9/2027 Load 9.9 MW |
| 2025-09-19 | SRRTEP Western Item 02 - APS Supplemental Projects p. 5 |
Price Hill, WV APS-2025-028 |
Price Hill Substation South Morgantown |
No figures printed |
| 2025-09-19 | SRRTEP Western Item 02 - APS Supplemental Projects p. 7 |
Oak Mound Control Building and Breakers APS-2024-095 |
Glen Falls Substation Oak Mound Substation Quiet Dell Substation Rider Waldo Run |
Status Conceptual Cost $13.35M In service 6/16/2028 |
| 2025-09-19 | SRRTEP Western Item 02 - APS Supplemental Projects p. 10 |
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line APS-2024-089 |
Oak Mound Substation Quiet Dell Substation |
Status Conceptual Cost $2.63M In service 6/16/2028 |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 3 |
Harper – West Akron 138 kV Line ATSI-2025-023 |
Harper West Akron |
No figures printed |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 4 |
Carlisle – Johnson 138 kV Line ATSI-2025-025 |
Carlisle Johnson |
No figures printed |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 6 |
Tusc Substation ATSI-2023-011 |
Firestone Pine South Akron Star Tusc Substation Urban Substation Wadsworth West Akron |
Status Conceptual Cost $16.72M In service 12/31/2027 |
| 2025-09-19 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 9 |
Firestone Substation ATSI-2025-021 |
Firestone South Akron Urban Substation |
Status Conceptual Cost $0.3M In service 2/16/2026 |
| 2025-09-19 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 3 |
Sandwich Substation ComEd-2025-019 |
Sandwich | No figures printed |
| 2025-09-19 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 4 |
Customer in Chicago ComEd-2025-020 |
None named | Load 179.4 MW |
| 2025-09-19 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 5 |
Customer in Chicago ComEd-2025-021 |
None named | Load 300 MW |
| 2025-09-19 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 7 |
Customer in Elk Grove ComEd-2024-003 · s3584.1; s3584.2 |
Dierking Elk Grove East Itasca Pine |
Status Engineering Cost $319.4M In service 12/31/2027 (s3584.1), 12/31/2028 (s3584.2) Load 250 MW |
| 2025-09-19 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 10 |
Customer in Manteno ComEd-2024-007 · s3343.1; s3343.2 |
None named | Status Phase 1: In-Service
Phase 2: Engineering Cost $62.4M In service (Phase 1) 12/31/2024 , (Phase 2) 12/31/2027 Load 113 MW |
| 2025-09-19 | SRRTEP Western Item 05 - Dayton Supplemental Projects p. 4 |
Auglaize County, OH Dayton-2021-004 |
Chippewa New Indian Lake Indian Lakesubstation Wrestle Creek New |
Status Conceptual Cost $61.3M In service 4/31/2030 |
| 2025-09-19 | SRRTEP Western Item 05 - Dayton Supplemental Projects p. 6 |
Dayton-2023-003 | Botkins St. Marys |
Status Conceptual Cost $ 43.2 M In service 06/2027 Load ~16MW |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 3 |
South East Canton, OH AEP-2025-OH020 |
Southeast Canton | In service 01/08/2028 Load 312MW |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 4 |
Canton Central, OH AEP-2025-OH021 |
Canton Central | In service 01/08/2028 Load 300MW |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 5 |
Calvin Switch, MI AEP-2025-IM009 |
Calvin Switch Corey Mottville Stone Lake |
No figures printed |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 7 |
Aloe Vera SW, WV AEP-2025-AP003 |
Aloe Vera SW New Baileysville Logan Switchback Trail Fork |
Status Engineering Cost 0 In service 03/05/2026 Load 7MW |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 9 |
Pike County, KY AEP-2023-AP006 |
Johns Creek Second Fork Simers New |
Status Engineering Cost $3.99 M In service 11/01/2025 Load 15 MW |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 11 |
Elcona Tap, IN AEP-2025-IM003 |
Dunlap East Elkhart Elcona Elcona Tap |
Status Scoping (Conceptual) Cost $18.128 M In service 05/02/2029 |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 13 |
Harrison, OH/Madison, OH AEP-2025-OH001 |
Erin Hills Switch New Harrison Madison |
Status Engineering Cost $11.015 M In service 06/08/2029 Load 17.5 MW |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 15 |
Greif, OH/Huntley, OH/Busch, OH/Lazelle, OH AEP-2025-OH003 |
Busch Greif Huntley Lazelle |
Status Engineering Cost $15.7 M In service 03/03/2028 |
| 2025-09-19 | SRRTEP Western Item 06 - AEP Supplemental Projects p. 17 |
Windsor, OH AEP-2025-OH004 |
Carrollton Krone Switch New Sunnyside |
Status Scoping (Conceptual) Cost $2.455 M In service 02/18/2027 Load 20 MW |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental
Derry, PA PPL-2025-0020 |
None named | No figures printed |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 4 |
PPL Transmission Zone: Supplemental
Hugesville, PA PPL-2025-0021 |
Hughesville | No figures printed |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 5 |
PPL Transmission Zone: Supplemental
Coopersburg, PA PPL-2025-0022 |
None named | No figures printed |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 7 |
PPL Transmission Zone: Supplemental
Rutherford, PA PPL-2025-0001 |
Rutherford 69-12kV Substation Rutherford distribution substation |
Status Conceptual Cost $0.5 M In service 05/30/2027 |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 9 |
PPL Transmission Zone: Supplemental
Frackville, PA PPL-2019-0004 |
None named | Status Conceptual Cost $45 M In service 06/30/2028 |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 11 |
PPL Transmission Zone: Supplemental
Keystone, PA PPL-2025-0016 |
None named | Status Conceptual Cost $0.7 M In service 02/28/2027 |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 02 - BGE Supplemental Projects p. 3 |
High Ridge to Dorsey Tap to Crystal Springs Tap BGE-2025-003 |
Crystal Springs Crystal Springs Tap Dorsey Run Dorsey Tap High Ridge |
No figures printed |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 02 - BGE Supplemental Projects p. 4 |
Jennifer Rd to Cedar Park Wood Poles BGE-2025-004 |
Cedar Park Jennifer Rd |
No figures printed |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 03 - PECO Supplemental Projects p. 3 |
PE-2025-003 | Waneeta | Status Planning/Design Cost $0.9 million In service 11/22/2026 |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 04 - DPL Supplemental Projects p. 3 |
DPL-2025-002 | Keeney Keeney EHV |
No figures printed |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 04 - DPL Supplemental Projects p. 5 |
DPL-2025-001 | Red Lion | Status Construction (Under construction) Cost $4.9 million In service 11/28/2025 |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 3 |
Edinboro South Substation PN-2023-006 |
Edinboro South Erie South Morgan Street Springboro |
Status Conceptual Cost $13.57M In service 6/18/2027 Load 43 MW |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 5 |
Morgan Street Substation PN-2023-008 |
Edinboro South Geneva Morgan Street Springboro Venango Jct |
Status Conceptual Cost $26.91M In service 12/3/2027 Load 67 MW |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 7 |
Spangler Substation PN-2024-003 |
Carrolltown Garman Nanty Glo Spangler St. Benedict |
Status Conceptual Cost $14.2M In service 7/12/2027 Load 27 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 3 |
Transco 165 DOM-2025-0019 |
None named | In service 07/30/2027 Load 51 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 4 |
Mayo Dunbar DOM-2025-0022 |
Mayo Dunbar DP | Load 9.2 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 5 |
Lewis Drive DOM-2025-0029 |
Rogers Rd Sub | In service 10/01/2026 Load 25 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 6 |
Bass DP DOM-2025-0034 |
None named | In service 10/01/2025 Load 6.5 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 7 |
Island Creek DOM-2025-0035 |
Island Creek DP | In service February of 2026 Load 3 – 6 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 8 |
Trego DOM-2025-0036 |
Trego Substation | In service 04/30/2026 Load 7.7 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 9 |
Metcalf DOM-2025-0037 |
Metcalf | In service 04/30/2027 Load 10.9 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 10 |
Dominion DOM-2025-0038 |
Dominion substation | In service 12/31/2026 Load 16.1 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 11 |
Emporia DOM-2025-0039 |
Emporia substation | In service 04/30/2029 Load 18.1 MW |
| 2025-09-18 | SRRTEP Southern Item 06 - DOM Supplemental Projects p. 14 |
Disputanta DOM-2025-0014 |
Disputanta Substation | Status Engineering Cost $670k In service 12/31/2026 Load 1.4 MW |
| 2025-09-09 | TEAC Item 05 - APS Supplemental Projects p. 3 |
Doubs to Lime Kiln 230 kV APS-2025-021 |
Doubs Lime Kiln |
In service 09/2030 Load 600 MVA |
| 2025-09-09 | TEAC Item 05 - APS Supplemental Projects p. 5 |
Kammer Substation APS-2025-020 |
502 Junction Substation Kammer Substation |
Status Conceptual Cost $9.25 M In service 8/15/2030 |
| 2025-09-09 | TEAC Item 06 - JCPL Supplemental Projects p. 3 |
West Wharton No. 1 230-34.5 kV Transformer JCPL-2024-002 |
West Wharton | Status Conceptual Cost $12.00 M In service 11/9/2029 |
| 2025-09-09 | TEAC Item 06 - JCPL Supplemental Projects p. 5 |
West Wharton No. 2 230-34.5 kV Transformer JCPL-2024-024 |
West Wharton | Status Conceptual Cost $12.00 M In service 12/22/2028 |
| 2025-09-09 | TEAC Item 07 - Dayton Supplemental Projects p. 3 |
Dayton-2025-008 | Darby Substation | In service 1/2029 Load 800 MW |
| 2025-09-09 | TEAC Item 07 - Dayton Supplemental Projects p. 5 |
Dayton-2025-003 | Darby Substation Millcreek Peoria |
Status Conceptual Cost $74.1M In service 4/2028 Load 135 MW |
| 2025-09-09 | TEAC Item 07 - Dayton Supplemental Projects p. 7 |
Dayton-2025-005 | Creekside Millcreek Shelby Sidney |
Status Conceptual Cost $69.6M In service 6/2029 Load 400 MW |
| 2025-09-09 | TEAC Item 08 - DLCO Supplemental Project p. 3 |
Monroeville, PA DLC-2024-003 |
Brunot Island Carson Substation Cheswick Huntingdon McGinley Substation New Springdale Yukon |
Status Planning (Conceptual) Cost $46.3 M In service January 2029 Load up to 250 MW |
| 2025-09-09 | TEAC Item 09 - PPL Supplemental Projects p. 3 |
Lackawanna, PA PPL-2025-0013 |
None named | In service 07/2028 Load 1,400 MW |
| 2025-09-09 | TEAC Item 09 - PPL Supplemental Projects p. 4 |
Archbald Mountain, PA PPL-2025-0014 |
None named | In service 05/2027 Load 1,000 MW |
| 2025-09-09 | TEAC Item 09 - PPL Supplemental Projects p. 5 |
Dorrance, PA PPL-2025-0015 |
None named | In service 05/2028 Load 600 MW |
| 2025-09-09 | TEAC Item 09 - PPL Supplemental Projects p. 7 |
Tresckow, PA PPL-2025-0010 |
Glen Brook Harwood Nescopeck Slykerville Susquehanna Tomhicken Tresckow |
Cost $95 M In service 05/30/2028 Load 1,000 MW |
| 2025-09-09 | TEAC Item 09 - PPL Supplemental Projects p. 9 |
Big Bass, PA PPL-2025-0012 |
Acahela Big Bass New Callender Gap Jenkins Lackawanna Palooka Paupack Pocono |
Cost $186.875 M In service 05/30/2028 Load 1,500 MW |
| 2025-09-09 | TEAC Item 10 - PECO Supplemental Projects p. 3 |
PE-2025-002 | Jenkintown Whitemarsh Whitpain |
Cost $3.6 million In service 03/10/2025 |
| 2025-09-09 | TEAC Item 11 - PEPCO Supplemental Projects p. 3 |
Champlain Substation PEP-2025-003 |
Champlain F street Georgetown I street L street Takoma |
Status Engineering Cost $590M In service 7/1/2029 |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 2 |
Customer in Plano ComEd-2024-015 |
None named | Load 600 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 4 |
Customer in DeKalb ComEd-2025-009 |
None named | Load 504 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 5 |
Customer in DeKalb ComEd-2025-010 |
None named | Load 860 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 6 |
Customer in Morris ComEd-2025-011 |
None named | Load 1,000 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 7 |
Customer in Braidwood ComEd-2025-012 |
None named | Load 750 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 8 |
Customer in Coal City ComEd-2025-013 |
None named | Load 1,296 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 9 |
Customer in Rockford ComEd-2025-014 |
None named | Load 600 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 10 |
Customer in Minooka ComEd-2025-015 |
None named | Load 588 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 11 |
Customer in Joliet ComEd-2025-016 |
None named | Load 1,800 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 12 |
Customer in Aurora ComEd-2025-017 |
None named | Load 450 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 13 |
Lockport 345 kV BT 1-2 CB ComEd-2025-018 |
Lockport | No figures printed |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 15 |
Customer in Plano ComEd-2024-014 |
LaSalle Plano |
Status Conceptual Cost $35.3 M In service 5/1/2028 Load 480 MW |
| 2025-09-09 | TEAC Item 12 - ComEd Supplemental Projects p. 17 |
Customer in Hoffman Estates ComEd-2024-016 |
Beverly Road New Libertyville Silver Lake Tollway Wayne |
Status Conceptual Cost $84.8M In service 9/1/2028 Load 612 MW |
| 2025-09-09 | TEAC Item 13 - BGE Supplemental Projects p. 3 |
Riverside Breaker B52 BGE-2025-001 |
Riverside | No figures printed |
| 2025-09-09 | TEAC Item 13 - BGE Supplemental Projects p. 4 |
Riverside Breaker B53 BGE-2025-002 |
Riverside | No figures printed |
| 2025-09-09 | TEAC Item 14 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2025-0026 Update |
Chesterfield Chickahominy Ladysmith Lanexa Possum Point Providence Forge Turner |
Status Engineering Cost $160M In service 12/31/2028 |
| 2025-09-09 | TEAC Item 14 - DOM Supplemental Projects p. 5 |
Matta 230kV Delivery - DEV DOM-2023-0023 |
Kraken Ladysmith CT Matta New |
Status Engineering Cost $25.5 M In service 11/15/2026 Load 300 MW |
| 2025-09-09 | TEAC Item 14 - DOM Supplemental Projects p. 7 |
Azalea Lane 230kV Delivery - NOVEC DOM-2023-0003 |
Azalea Lane New Brambleton Evergreen Mills |
Status Engineering Cost $56.5 M In service 12/31/2029 Load 67.0 MW |
| 2025-09-09 | TEAC Item 14 - DOM Supplemental Projects p. 9 |
Do No Harm Analysis DOM-2023-0002-DNH |
Azalea Lane Brambleton Loudoun Racefield Reed Farm (South Fork) |
Status Conceptual Cost $20.0 M In service 12/31/2029 |
| 2025-09-09 | TEAC Item 15 - PSEG Supplemental Projects p. 3 |
Mount Laurel Area PSEG-2024-0004 |
Briggs Rd New Burlington Cox’s Corner Creek Rd New Lumberton Mount Holly Mount Laurel Substation |
Status Conceptual Cost $85.0M In service 05/2031 |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 40 |
2025-W1-63 2025-W1-63 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 42 |
2025-W1-195 2025-W1-195 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 44 |
2025-W1-298 2025-W1-298 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 46 |
2025-W1-341 2025-W1-341 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 48 |
2025-W1-348 2025-W1-348 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 50 |
2025-W1-354 2025-W1-354 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 52 |
2025-W1-377 2025-W1-377 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 54 |
2025-W1-385 2025-W1-385 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 56 |
2025-W1-431 2025-W1-431 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 58 |
2025-W1-439 2025-W1-439 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 60 |
2025-W1-459 2025-W1-459 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 62 |
2025-W1-515 2025-W1-515 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 64 |
2025-W1-517 2025-W1-517 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 66 |
2025-W1-626 2025-W1-626 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 68 |
2025-W1-662 2025-W1-662 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 70 |
2025-W1-689 2025-W1-689 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 72 |
2025-W1-724 2025-W1-724 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 74 |
2025-W1-729 2025-W1-729 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 76 |
2025-W1-749 2025-W1-749 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 78 |
2025-W1-757 2025-W1-757 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 80 |
2025-W1-873 2025-W1-873 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 82 |
2025-W1-940 2025-W1-940 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 84 |
2025-W1-980 2025-W1-980 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 86 |
2025-W1-981 2025-W1-981 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 88 |
2025-W1-996 2025-W1-996 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 91 |
2025-W1-156 2025-W1-156 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 94 |
2025-W1-20 2025-W1-20 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 96 |
2025-W1-260 2025-W1-260 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 98 |
2025-W1-543 2025-W1-543 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 100 |
2025-W1-672 2025-W1-672 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 103 |
2025-W1-402 2025-W1-402 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 105 |
2025-W1-457 2025-W1-457 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 107 |
2025-W1-906 2025-W1-906 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 110 |
2025-W1-465 2025-W1-465 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 112 |
2025-W1-823 2025-W1-823 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 115 |
2025-W1-140 2025-W1-140 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 118 |
2025-W1-493 2025-W1-493 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 120 |
2025-W1-578 2025-W1-578 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 122 |
2025-W1-826 2025-W1-826 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 124 |
2025-W1-838 2025-W1-838 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 127 |
2025-W1-125 2025-W1-125 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 129 |
2025-W1-579 2025-W1-579 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 131 |
2025-W1-758 2025-W1-758 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 134 |
2025-W1-371 2025-W1-371 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 136 |
2025-W1-851 2025-W1-851 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 138 |
2025-W1-919 2025-W1-919 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 141 |
2025-W1-631 2025-W1-631 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 143 |
2025-W1-692 2025-W1-692 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 146 |
2025-W1-16 2025-W1-16 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 148 |
2025-W1-158 2025-W1-158 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 150 |
2025-W1-317 2025-W1-317 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 152 |
2025-W1-333 2025-W1-333 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 154 |
2025-W1-422 2025-W1-422 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 156 |
2025-W1-558 2025-W1-558 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 158 |
2025-W1-588 2025-W1-588 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 160 |
2025-W1-647 2025-W1-647 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 162 |
2025-W1-688 2025-W1-688 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 164 |
2025-W1-824 2025-W1-824 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 166 |
2025-W1-853 2025-W1-853 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 168 |
2025-W1-855 2025-W1-855 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 170 |
2025-W1-945 2025-W1-945 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 172 |
2025-W1-946 2025-W1-946 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 174 |
2025-W1-958 2025-W1-958 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 176 |
2025-W1-190 2025-W1-190 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 178 |
2025-W1-199 2025-W1-199 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 180 |
2025-W1-290 2025-W1-290 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 182 |
2025-W1-434 2025-W1-434 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 184 |
2025-W1-491 2025-W1-491 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 186 |
2025-W1-556 2025-W1-556 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 188 |
2025-W1-756 2025-W1-756 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 190 |
2025-W1-769 2025-W1-769 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 192 |
2025-W1-794 2025-W1-794 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 194 |
2025-W1-918 2025-W1-918 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 199 |
2025-W1-60 2025-W1-60 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 201 |
2025-W1-241 2025-W1-241 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 203 |
2025-W1-423 2025-W1-423 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 205 |
2025-W1-619 2025-W1-619 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 207 |
2025-W1-907 2025-W1-907 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 210 |
2025-W1-938 2025-W1-938 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 213 |
2025-W1-552 2025-W1-552 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 216 |
2025-W1-51 2025-W1-51 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 218 |
2025-W1-331 2025-W1-331 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 220 |
2025-W1-570 2025-W1-570 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 222 |
2025-W1-781 2025-W1-781 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 225 |
2025-W1-275 2025-W1-275 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 227 |
2025-W1-326 2025-W1-326 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 229 |
2025-W1-352 2025-W1-352 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 231 |
2025-W1-474 2025-W1-474 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 233 |
2025-W1-547 2025-W1-547 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 235 |
2025-W1-616 2025-W1-616 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 237 |
2025-W1-705 2025-W1-705 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 239 |
2025-W1-848 2025-W1-848 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 241 |
2025-W1-9 | None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 243 |
2025-W1-24 2025-W1-24 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 245 |
2025-W1-48 2025-W1-48 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 247 |
2025-W1-55 2025-W1-55 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 249 |
2025-W1-98 2025-W1-98 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 251 |
2025-W1-117 2025-W1-117 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 253 |
2025-W1-126 2025-W1-126 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 255 |
2025-W1-238 2025-W1-238 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 257 |
2025-W1-243 2025-W1-243 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 259 |
2025-W1-247 2025-W1-247 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 261 |
2025-W1-253 2025-W1-253 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 263 |
2025-W1-264 2025-W1-264 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 265 |
2025-W1-302 2025-W1-302 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 267 |
2025-W1-306 2025-W1-306 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 269 |
2025-W1-311 2025-W1-311 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 271 |
2025-W1-339 2025-W1-339 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 273 |
2025-W1-409 2025-W1-409 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 275 |
2025-W1-557 2025-W1-557 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 276 |
2025-W1-577 2025-W1-577 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 277 |
2025-W1-627 2025-W1-627 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 279 |
2025-W1-755 2025-W1-755 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 281 |
2025-W1-815 2025-W1-815 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 283 |
2025-W1-825 2025-W1-825 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 285 |
2025-W1-868 2025-W1-868 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 287 |
2025-W1-911 2025-W1-911 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 289 |
2025-W1-916 2025-W1-916 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 291 |
2025-W1-948 2025-W1-948 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 293 |
2025-W1-321 2025-W1-321 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 295 |
2025-W1-458 2025-W1-458 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 297 |
2025-W1-975 2025-W1-975 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 299 |
2025-W1-245 2025-W1-245 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 301 |
2025-W1-476 2025-W1-476 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 304 |
2025-W1-109 2025-W1-109 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 306 |
2025-W1-152 2025-W1-152 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 308 |
2025-W1-237 2025-W1-237 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 310 |
2025-W1-687 2025-W1-687 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 312 |
2025-W1-771 2025-W1-771 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 314 |
2025-W1-871 2025-W1-871 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 316 |
2025-W1-896 2025-W1-896 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 318 |
2025-W1-987 2025-W1-987 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 320 |
2025-W1-334 2025-W1-334 |
None named | No figures printed |
| 2025-09-09 | TEAC Item 16 - Reliability Analysis Update p. 322 |
2025-W1-239 2025-W1-239 |
None named | No figures printed |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.