Substation Scout

Mentions: September 2025

Each row is one PJM document naming substations for one project, newest first. Atom feed

Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)

DateDocumentProjectSubstations namedAs printed
2025-09-19 SRRTEP Western
Item 01 - AMPT Supplemental Projects p. 3
Orrville 2nd Source
AMPT-2023-004
Apple Ave
Apple Ave subs
E. Wooster
East Wooster
Mineral Springs New
Status Engineering (AMPT), Conceptual (AEP and FE)
Cost $71.7 M
In service AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028)
Load 60 MW
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 3
Bethel Park, PA
APS-2025-026
Bethel Park Substation
St Clair
No figures printed
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 4
Kiski Valley, PA/North Washington, PA
APS-2025-027
Kiski Valley
North Washington
In service 6/9/2027
Load 9.9 MW
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 5
Price Hill, WV
APS-2025-028
Price Hill Substation
South Morgantown
No figures printed
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 7
Oak Mound Control Building and Breakers
APS-2024-095
Glen Falls Substation
Oak Mound Substation
Quiet Dell Substation
Rider
Waldo Run
Status Conceptual
Cost $13.35M
In service 6/16/2028
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 10
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line
APS-2024-089
Oak Mound Substation
Quiet Dell Substation
Status Conceptual
Cost $2.63M
In service 6/16/2028
2025-09-19 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 3
Harper – West Akron 138 kV Line
ATSI-2025-023
Harper
West Akron
No figures printed
2025-09-19 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 4
Carlisle – Johnson 138 kV Line
ATSI-2025-025
Carlisle
Johnson
No figures printed
2025-09-19 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 6
Tusc Substation
ATSI-2023-011
Firestone
Pine
South Akron
Star
Tusc Substation
Urban Substation
Wadsworth
West Akron
Status Conceptual
Cost $16.72M
In service 12/31/2027
2025-09-19 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 9
Firestone Substation
ATSI-2025-021
Firestone
South Akron
Urban Substation
Status Conceptual
Cost $0.3M
In service 2/16/2026
2025-09-19 SRRTEP Western
Item 04 - ComEd Supplemental Projects p. 3
Sandwich Substation
ComEd-2025-019
Sandwich No figures printed
2025-09-19 SRRTEP Western
Item 04 - ComEd Supplemental Projects p. 4
Customer in Chicago
ComEd-2025-020
None named Load 179.4 MW
2025-09-19 SRRTEP Western
Item 04 - ComEd Supplemental Projects p. 5
Customer in Chicago
ComEd-2025-021
None named Load 300 MW
2025-09-19 SRRTEP Western
Item 04 - ComEd Supplemental Projects p. 7
Customer in Elk Grove
ComEd-2024-003 · s3584.1; s3584.2
Dierking
Elk Grove East
Itasca
Pine
Status Engineering
Cost $319.4M
In service 12/31/2027 (s3584.1), 12/31/2028 (s3584.2)
Load 250 MW
2025-09-19 SRRTEP Western
Item 04 - ComEd Supplemental Projects p. 10
Customer in Manteno
ComEd-2024-007 · s3343.1; s3343.2
None named Status Phase 1: In-Service Phase 2: Engineering
Cost $62.4M
In service (Phase 1) 12/31/2024 , (Phase 2) 12/31/2027
Load 113 MW
2025-09-19 SRRTEP Western
Item 05 - Dayton Supplemental Projects p. 4
Auglaize County, OH
Dayton-2021-004
Chippewa New
Indian Lake
Indian Lakesubstation
Wrestle Creek New
Status Conceptual
Cost $61.3M
In service 4/31/2030
2025-09-19 SRRTEP Western
Item 05 - Dayton Supplemental Projects p. 6
Dayton-2023-003 Botkins
St. Marys
Status Conceptual
Cost $ 43.2 M
In service 06/2027
Load ~16MW
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 3
South East Canton, OH
AEP-2025-OH020
Southeast Canton In service 01/08/2028
Load 312MW
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 4
Canton Central, OH
AEP-2025-OH021
Canton Central In service 01/08/2028
Load 300MW
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 5
Calvin Switch, MI
AEP-2025-IM009
Calvin Switch
Corey
Mottville
Stone Lake
No figures printed
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 7
Aloe Vera SW, WV
AEP-2025-AP003
Aloe Vera SW New
Baileysville
Logan
Switchback
Trail Fork
Status Engineering
Cost 0
In service 03/05/2026
Load 7MW
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 9
Pike County, KY
AEP-2023-AP006
Johns Creek
Second Fork
Simers New
Status Engineering
Cost $3.99 M
In service 11/01/2025
Load 15 MW
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 11
Elcona Tap, IN
AEP-2025-IM003
Dunlap
East Elkhart
Elcona
Elcona Tap
Status Scoping (Conceptual)
Cost $18.128 M
In service 05/02/2029
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 13
Harrison, OH/Madison, OH
AEP-2025-OH001
Erin Hills Switch New
Harrison
Madison
Status Engineering
Cost $11.015 M
In service 06/08/2029
Load 17.5 MW
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 15
Greif, OH/Huntley, OH/Busch, OH/Lazelle, OH
AEP-2025-OH003
Busch
Greif
Huntley
Lazelle
Status Engineering
Cost $15.7 M
In service 03/03/2028
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 17
Windsor, OH
AEP-2025-OH004
Carrollton
Krone Switch New
Sunnyside
Status Scoping (Conceptual)
Cost $2.455 M
In service 02/18/2027
Load 20 MW
2025-09-18 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 3
PPL Transmission Zone: Supplemental Derry, PA
PPL-2025-0020
None named No figures printed
2025-09-18 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 4
PPL Transmission Zone: Supplemental Hugesville, PA
PPL-2025-0021
Hughesville No figures printed
2025-09-18 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 5
PPL Transmission Zone: Supplemental Coopersburg, PA
PPL-2025-0022
None named No figures printed
2025-09-18 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 7
PPL Transmission Zone: Supplemental Rutherford, PA
PPL-2025-0001
Rutherford 69-12kV Substation
Rutherford distribution substation
Status Conceptual
Cost $0.5 M
In service 05/30/2027
2025-09-18 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 9
PPL Transmission Zone: Supplemental Frackville, PA
PPL-2019-0004
None named Status Conceptual
Cost $45 M
In service 06/30/2028
2025-09-18 SRRTEP Mid-Atlantic
Item 01 - PPL Supplemental Projects p. 11
PPL Transmission Zone: Supplemental Keystone, PA
PPL-2025-0016
None named Status Conceptual
Cost $0.7 M
In service 02/28/2027
2025-09-18 SRRTEP Mid-Atlantic
Item 02 - BGE Supplemental Projects p. 3
High Ridge to Dorsey Tap to Crystal Springs Tap
BGE-2025-003
Crystal Springs
Crystal Springs Tap
Dorsey Run
Dorsey Tap
High Ridge
No figures printed
2025-09-18 SRRTEP Mid-Atlantic
Item 02 - BGE Supplemental Projects p. 4
Jennifer Rd to Cedar Park Wood Poles
BGE-2025-004
Cedar Park
Jennifer Rd
No figures printed
2025-09-18 SRRTEP Mid-Atlantic
Item 03 - PECO Supplemental Projects p. 3
PE-2025-003 Waneeta Status Planning/Design
Cost $0.9 million
In service 11/22/2026
2025-09-18 SRRTEP Mid-Atlantic
Item 04 - DPL Supplemental Projects p. 3
DPL-2025-002 Keeney
Keeney EHV
No figures printed
2025-09-18 SRRTEP Mid-Atlantic
Item 04 - DPL Supplemental Projects p. 5
DPL-2025-001 Red Lion Status Construction (Under construction)
Cost $4.9 million
In service 11/28/2025
2025-09-18 SRRTEP Mid-Atlantic
Item 05 - PENELEC Supplemental Projects p. 3
Edinboro South Substation
PN-2023-006
Edinboro South
Erie South
Morgan Street
Springboro
Status Conceptual
Cost $13.57M
In service 6/18/2027
Load 43 MW
2025-09-18 SRRTEP Mid-Atlantic
Item 05 - PENELEC Supplemental Projects p. 5
Morgan Street Substation
PN-2023-008
Edinboro South
Geneva
Morgan Street
Springboro
Venango Jct
Status Conceptual
Cost $26.91M
In service 12/3/2027
Load 67 MW
2025-09-18 SRRTEP Mid-Atlantic
Item 05 - PENELEC Supplemental Projects p. 7
Spangler Substation
PN-2024-003
Carrolltown
Garman
Nanty Glo
Spangler
St. Benedict
Status Conceptual
Cost $14.2M
In service 7/12/2027
Load 27 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 3
Transco 165
DOM-2025-0019
None named In service 07/30/2027
Load 51 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 4
Mayo Dunbar
DOM-2025-0022
Mayo Dunbar DP Load 9.2 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 5
Lewis Drive
DOM-2025-0029
Rogers Rd Sub In service 10/01/2026
Load 25 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 6
Bass DP
DOM-2025-0034
None named In service 10/01/2025
Load 6.5 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 7
Island Creek
DOM-2025-0035
Island Creek DP In service February of 2026
Load 3 – 6 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 8
Trego
DOM-2025-0036
Trego Substation In service 04/30/2026
Load 7.7 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 9
Metcalf
DOM-2025-0037
Metcalf In service 04/30/2027
Load 10.9 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 10
Dominion
DOM-2025-0038
Dominion substation In service 12/31/2026
Load 16.1 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 11
Emporia
DOM-2025-0039
Emporia substation In service 04/30/2029
Load 18.1 MW
2025-09-18 SRRTEP Southern
Item 06 - DOM Supplemental Projects p. 14
Disputanta
DOM-2025-0014
Disputanta Substation Status Engineering
Cost $670k
In service 12/31/2026
Load 1.4 MW
2025-09-09 TEAC
Item 05 - APS Supplemental Projects p. 3
Doubs to Lime Kiln 230 kV
APS-2025-021
Doubs
Lime Kiln
In service 09/2030
Load 600 MVA
2025-09-09 TEAC
Item 05 - APS Supplemental Projects p. 5
Kammer Substation
APS-2025-020
502 Junction Substation
Kammer Substation
Status Conceptual
Cost $9.25 M
In service 8/15/2030
2025-09-09 TEAC
Item 06 - JCPL Supplemental Projects p. 3
West Wharton No. 1 230-34.5 kV Transformer
JCPL-2024-002
West Wharton Status Conceptual
Cost $12.00 M
In service 11/9/2029
2025-09-09 TEAC
Item 06 - JCPL Supplemental Projects p. 5
West Wharton No. 2 230-34.5 kV Transformer
JCPL-2024-024
West Wharton Status Conceptual
Cost $12.00 M
In service 12/22/2028
2025-09-09 TEAC
Item 07 - Dayton Supplemental Projects p. 3
Dayton-2025-008 Darby Substation In service 1/2029
Load 800 MW
2025-09-09 TEAC
Item 07 - Dayton Supplemental Projects p. 5
Dayton-2025-003 Darby Substation
Millcreek
Peoria
Status Conceptual
Cost $74.1M
In service 4/2028
Load 135 MW
2025-09-09 TEAC
Item 07 - Dayton Supplemental Projects p. 7
Dayton-2025-005 Creekside
Millcreek
Shelby
Sidney
Status Conceptual
Cost $69.6M
In service 6/2029
Load 400 MW
2025-09-09 TEAC
Item 08 - DLCO Supplemental Project p. 3
Monroeville, PA
DLC-2024-003
Brunot Island
Carson Substation
Cheswick
Huntingdon
McGinley Substation New
Springdale
Yukon
Status Planning (Conceptual)
Cost $46.3 M
In service January 2029
Load up to 250 MW
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 3
Lackawanna, PA
PPL-2025-0013
None named In service 07/2028
Load 1,400 MW
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 4
Archbald Mountain, PA
PPL-2025-0014
None named In service 05/2027
Load 1,000 MW
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 5
Dorrance, PA
PPL-2025-0015
None named In service 05/2028
Load 600 MW
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 7
Tresckow, PA
PPL-2025-0010
Glen Brook
Harwood
Nescopeck
Slykerville
Susquehanna
Tomhicken
Tresckow
Cost $95 M
In service 05/30/2028
Load 1,000 MW
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 9
Big Bass, PA
PPL-2025-0012
Acahela
Big Bass New
Callender Gap
Jenkins
Lackawanna
Palooka
Paupack
Pocono
Cost $186.875 M
In service 05/30/2028
Load 1,500 MW
2025-09-09 TEAC
Item 10 - PECO Supplemental Projects p. 3
PE-2025-002 Jenkintown
Whitemarsh
Whitpain
Cost $3.6 million
In service 03/10/2025
2025-09-09 TEAC
Item 11 - PEPCO Supplemental Projects p. 3
Champlain Substation
PEP-2025-003
Champlain
F street
Georgetown
I street
L street
Takoma
Status Engineering
Cost $590M
In service 7/1/2029
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 2
Customer in Plano
ComEd-2024-015
None named Load 600 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 4
Customer in DeKalb
ComEd-2025-009
None named Load 504 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 5
Customer in DeKalb
ComEd-2025-010
None named Load 860 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 6
Customer in Morris
ComEd-2025-011
None named Load 1,000 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 7
Customer in Braidwood
ComEd-2025-012
None named Load 750 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 8
Customer in Coal City
ComEd-2025-013
None named Load 1,296 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 9
Customer in Rockford
ComEd-2025-014
None named Load 600 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 10
Customer in Minooka
ComEd-2025-015
None named Load 588 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 11
Customer in Joliet
ComEd-2025-016
None named Load 1,800 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 12
Customer in Aurora
ComEd-2025-017
None named Load 450 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 13
Lockport 345 kV BT 1-2 CB
ComEd-2025-018
Lockport No figures printed
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 15
Customer in Plano
ComEd-2024-014
LaSalle
Plano
Status Conceptual
Cost $35.3 M
In service 5/1/2028
Load 480 MW
2025-09-09 TEAC
Item 12 - ComEd Supplemental Projects p. 17
Customer in Hoffman Estates
ComEd-2024-016
Beverly Road New
Libertyville
Silver Lake
Tollway
Wayne
Status Conceptual
Cost $84.8M
In service 9/1/2028
Load 612 MW
2025-09-09 TEAC
Item 13 - BGE Supplemental Projects p. 3
Riverside Breaker B52
BGE-2025-001
Riverside No figures printed
2025-09-09 TEAC
Item 13 - BGE Supplemental Projects p. 4
Riverside Breaker B53
BGE-2025-002
Riverside No figures printed
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk
DOM-2025-0026 Update
Chesterfield
Chickahominy
Ladysmith
Lanexa
Possum Point
Providence Forge
Turner
Status Engineering
Cost $160M
In service 12/31/2028
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 5
Matta 230kV Delivery - DEV
DOM-2023-0023
Kraken
Ladysmith CT
Matta New
Status Engineering
Cost $25.5 M
In service 11/15/2026
Load 300 MW
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 7
Azalea Lane 230kV Delivery - NOVEC
DOM-2023-0003
Azalea Lane New
Brambleton
Evergreen Mills
Status Engineering
Cost $56.5 M
In service 12/31/2029
Load 67.0 MW
2025-09-09 TEAC
Item 14 - DOM Supplemental Projects p. 9
Do No Harm Analysis
DOM-2023-0002-DNH
Azalea Lane
Brambleton
Loudoun
Racefield
Reed Farm (South Fork)
Status Conceptual
Cost $20.0 M
In service 12/31/2029
2025-09-09 TEAC
Item 15 - PSEG Supplemental Projects p. 3
Mount Laurel Area
PSEG-2024-0004
Briggs Rd New
Burlington
Cox’s Corner
Creek Rd New
Lumberton
Mount Holly
Mount Laurel Substation
Status Conceptual
Cost $85.0M
In service 05/2031
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 40
2025-W1-63
2025-W1-63
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 42
2025-W1-195
2025-W1-195
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 44
2025-W1-298
2025-W1-298
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 46
2025-W1-341
2025-W1-341
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 48
2025-W1-348
2025-W1-348
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 50
2025-W1-354
2025-W1-354
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 52
2025-W1-377
2025-W1-377
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 54
2025-W1-385
2025-W1-385
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 56
2025-W1-431
2025-W1-431
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 58
2025-W1-439
2025-W1-439
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 60
2025-W1-459
2025-W1-459
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 62
2025-W1-515
2025-W1-515
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 64
2025-W1-517
2025-W1-517
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 66
2025-W1-626
2025-W1-626
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 68
2025-W1-662
2025-W1-662
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 70
2025-W1-689
2025-W1-689
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 72
2025-W1-724
2025-W1-724
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 74
2025-W1-729
2025-W1-729
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 76
2025-W1-749
2025-W1-749
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 78
2025-W1-757
2025-W1-757
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 80
2025-W1-873
2025-W1-873
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 82
2025-W1-940
2025-W1-940
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 84
2025-W1-980
2025-W1-980
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 86
2025-W1-981
2025-W1-981
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 88
2025-W1-996
2025-W1-996
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 91
2025-W1-156
2025-W1-156
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 94
2025-W1-20
2025-W1-20
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 96
2025-W1-260
2025-W1-260
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 98
2025-W1-543
2025-W1-543
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 100
2025-W1-672
2025-W1-672
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 103
2025-W1-402
2025-W1-402
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 105
2025-W1-457
2025-W1-457
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 107
2025-W1-906
2025-W1-906
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 110
2025-W1-465
2025-W1-465
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 112
2025-W1-823
2025-W1-823
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 115
2025-W1-140
2025-W1-140
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 118
2025-W1-493
2025-W1-493
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 120
2025-W1-578
2025-W1-578
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 122
2025-W1-826
2025-W1-826
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 124
2025-W1-838
2025-W1-838
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 127
2025-W1-125
2025-W1-125
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 129
2025-W1-579
2025-W1-579
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 131
2025-W1-758
2025-W1-758
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 134
2025-W1-371
2025-W1-371
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 136
2025-W1-851
2025-W1-851
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 138
2025-W1-919
2025-W1-919
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 141
2025-W1-631
2025-W1-631
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 143
2025-W1-692
2025-W1-692
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 146
2025-W1-16
2025-W1-16
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 148
2025-W1-158
2025-W1-158
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 150
2025-W1-317
2025-W1-317
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 152
2025-W1-333
2025-W1-333
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 154
2025-W1-422
2025-W1-422
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 156
2025-W1-558
2025-W1-558
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 158
2025-W1-588
2025-W1-588
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 160
2025-W1-647
2025-W1-647
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 162
2025-W1-688
2025-W1-688
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 164
2025-W1-824
2025-W1-824
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 166
2025-W1-853
2025-W1-853
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 168
2025-W1-855
2025-W1-855
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 170
2025-W1-945
2025-W1-945
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 172
2025-W1-946
2025-W1-946
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 174
2025-W1-958
2025-W1-958
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 176
2025-W1-190
2025-W1-190
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 178
2025-W1-199
2025-W1-199
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 180
2025-W1-290
2025-W1-290
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 182
2025-W1-434
2025-W1-434
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 184
2025-W1-491
2025-W1-491
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 186
2025-W1-556
2025-W1-556
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 188
2025-W1-756
2025-W1-756
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 190
2025-W1-769
2025-W1-769
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 192
2025-W1-794
2025-W1-794
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 194
2025-W1-918
2025-W1-918
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 199
2025-W1-60
2025-W1-60
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 201
2025-W1-241
2025-W1-241
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 203
2025-W1-423
2025-W1-423
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 205
2025-W1-619
2025-W1-619
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 207
2025-W1-907
2025-W1-907
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 210
2025-W1-938
2025-W1-938
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 213
2025-W1-552
2025-W1-552
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 216
2025-W1-51
2025-W1-51
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 218
2025-W1-331
2025-W1-331
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 220
2025-W1-570
2025-W1-570
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 222
2025-W1-781
2025-W1-781
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 225
2025-W1-275
2025-W1-275
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 227
2025-W1-326
2025-W1-326
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 229
2025-W1-352
2025-W1-352
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 231
2025-W1-474
2025-W1-474
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 233
2025-W1-547
2025-W1-547
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 235
2025-W1-616
2025-W1-616
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 237
2025-W1-705
2025-W1-705
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 239
2025-W1-848
2025-W1-848
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 241
2025-W1-9 None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 243
2025-W1-24
2025-W1-24
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 245
2025-W1-48
2025-W1-48
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 247
2025-W1-55
2025-W1-55
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 249
2025-W1-98
2025-W1-98
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 251
2025-W1-117
2025-W1-117
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 253
2025-W1-126
2025-W1-126
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 255
2025-W1-238
2025-W1-238
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 257
2025-W1-243
2025-W1-243
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 259
2025-W1-247
2025-W1-247
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 261
2025-W1-253
2025-W1-253
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 263
2025-W1-264
2025-W1-264
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 265
2025-W1-302
2025-W1-302
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 267
2025-W1-306
2025-W1-306
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 269
2025-W1-311
2025-W1-311
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 271
2025-W1-339
2025-W1-339
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 273
2025-W1-409
2025-W1-409
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 275
2025-W1-557
2025-W1-557
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 276
2025-W1-577
2025-W1-577
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 277
2025-W1-627
2025-W1-627
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 279
2025-W1-755
2025-W1-755
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 281
2025-W1-815
2025-W1-815
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 283
2025-W1-825
2025-W1-825
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 285
2025-W1-868
2025-W1-868
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 287
2025-W1-911
2025-W1-911
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 289
2025-W1-916
2025-W1-916
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 291
2025-W1-948
2025-W1-948
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 293
2025-W1-321
2025-W1-321
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 295
2025-W1-458
2025-W1-458
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 297
2025-W1-975
2025-W1-975
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 299
2025-W1-245
2025-W1-245
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 301
2025-W1-476
2025-W1-476
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 304
2025-W1-109
2025-W1-109
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 306
2025-W1-152
2025-W1-152
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 308
2025-W1-237
2025-W1-237
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 310
2025-W1-687
2025-W1-687
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 312
2025-W1-771
2025-W1-771
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 314
2025-W1-871
2025-W1-871
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 316
2025-W1-896
2025-W1-896
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 318
2025-W1-987
2025-W1-987
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 320
2025-W1-334
2025-W1-334
None named No figures printed
2025-09-09 TEAC
Item 16 - Reliability Analysis Update p. 322
2025-W1-239
2025-W1-239
None named No figures printed

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)

Before relying on any of this