Named in 7 PJM planning documents for 4 projects, from October 8, 2024 to May 8, 2026.

Newdescribed as
PPLzone
230-69kV, 230kVkV as printed
9mentions

Described as new: “terminate at the new Tresckow 230kV switchyard” — source, page 11

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Tresckow, PA
PPL-2024-0004 · s3555
Conceptual $81 M 05/31/2027 1,000 MW 2025-10-08
TEAC
Harwood, PA
PPL-2024-0012 · s3549
Conceptual $73.3 M 05/30/2028 1,000 MW 2025-10-08
TEAC
Hauto, PA
PPL-2025-0002
Conceptual $101 M 05/30/2028 350 MW 2025-04-01
TEAC
PPL Transmission Zone: Supplemental
PPL-2025-0010 · S3818
Conceptual $88.5M 5/30/2027 1000 MW 2026-05-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2024-10-08 2024-11-06
In-service date 05/2027 → 05/30/2028 2025-03-04 2025-04-01
Cost estimate $95 M → $88.5M 2025-09-09 2026-05-08
Cost estimate
prior value printed on the same page
$95M → $88.5M 2026-05-08 2026-05-08
In-service date 05/2027 → 05/30/2028 2025-05-06 2025-09-09
In-service date 05/30/2028 → 5/30/2027 2025-09-09 2026-05-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 17
Tresckow, PA “new Tresckow 230kV switchyard”
230kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 7
Harwood, PA No role wording
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 4
PPL Transmission Zone: Supplemental “Install three new 230kV line terminals for the Customer lead lines at Tresckow 230kV yard”
230kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 17
Tresckow, PA “Install a four bay BAAH 230kV switchyard with a 125MVAR Capacitor bank”
230kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 7
Harwood, PA No role wording
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 8
PPL Transmission Zone: Supplemental “Install three new 230kV line terminals for the Customer lead lines at Tresckow 230kV yard”
230kV
2025-04-01 TEAC
Item 07 - PPL Supplemental Projects p. 6
Hauto, PA “Expand the proposed Tresckow 230kV switchyard”
230-69kV
2024-11-06 TEAC
Item 08 - PPL Supplemental Projects p. 10
Harwood, PA No role wording
230kV
2024-10-08 TEAC
Item 07 - PPL Supplemental Projects p. 11
Tresckow, PA “terminate at the new Tresckow 230kV switchyard”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.