Elk Mountain
Named in 4 PJM planning documents for 1 project, from March 18, 2026 to October 6, 2026.
Existingdescribed as
PPLzone
69-12kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Tinker Tap Strengthening PPL-2026-0017 |
Conceptual | $34.6 M | 11/30/2029 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ELK MOUNTAIN; TINKER → ELK MOUNTAIN; GREENFIELD; TINKER | 2026-03-18 | 2026-04-14 |
| Substations named | ELK MOUNTAIN; GREENFIELD; TINKER → BROOKSIDE; ELK MOUNTAIN; GREENFIELD; LACKAWANNA; TINKER | 2026-04-14 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 92 |
Tinker Tap Strengthening | “Tinker and Elk Mountain Distribution substations are susceptible to stranded load” 69-12kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 92 |
Tinker Tap Strengthening | “Tinker and Elk Mountain Distribution substations are susceptible to stranded load” |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 12 |
Tinker Tap Strengthening | No role wording |
| 2026-03-18 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects p. 6 |
Tinker Tap Strengthening | No role wording |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.