Watson

Named in 4 PJM planning documents for 1 project, from January 15, 2026 to October 6, 2026.

Existingdescribed as
PPLzone
69-12kVkV as printed
4mentions

PJM interconnection queue

A PJM queue substation page has the same name: Watson (PA) — 4 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Supplemental Watson, PA
PPL-2026-0005
Conceptual $0.5 M 04/01/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named WATSON → CLINTON; MILTON; WATSON 2026-01-15 2026-02-12

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 28
PPL Transmission Zone: Supplemental Watson, PA “feed the Watson 69-12kV Substation”
69-12kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 28
PPL Transmission Zone: Supplemental Watson, PA “feed the Watson 69-12kV Substation from an additional independent source”
69-12kV
2026-02-12 SRRTEP Mid-Atlantic
Item 05 - PPL Supplemental Projects p. 19
PPL Transmission Zone: Supplemental Watson, PA “feed the Watson 69-12kV Substation”
69-12kV
2026-01-15 SRRTEP Mid-Atlantic
Item 03 - PPL Supplemental Projects p. 3
PPL Transmission Zone: Supplemental Watson, PA “feed the Watson 69-12kV Substation from an additional independent source”
69-12kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.