Substation Scout

Meadow Brook

Named in 7 PJM planning documents for 7 projects, from October 8, 2024 to September 18, 2026.

Existingdescribed as
APSzone
138 kV, 500/138 kVkV as printed
8mentions

Also printed as: Meadow Brook Substation

PJM interconnection queue

A PJM queue substation page has the same name: Meadow Brook (VA) — 3 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Meadow Brook-West Winchester 138 kV
b3977.1
Not printed $0.35M 6/1/2030 Not printed 2025-11-14
SRRTEP Western
Meadow Brook-West Winchester 138 kV Not printed $0.35M 6/1/2030 Not printed 2025-10-17
SRRTEP Western
Meadow Brook Substation
APS-2023-037 · s3092.1
Not printed $ 2.3 M 12/20/2024 Not printed 2024-10-08
TEAC
Misoperations Relay
APS-2026-008
Not printed Not printed Not printed Not printed 2026-07-17
SRRTEP Western
Misoperation Relay Projects
APS-2026-031
Not printed Not printed Not printed Not printed 2026-06-17
SRRTEP Western
Misoperation Relays
APS-2026-055
Not printed Not printed Not printed Not printed 2026-09-18
SRRTEP Western
Misoperation Relays
APS-2026-056
Not printed Not printed Not printed Not printed 2026-09-18
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named KISKI VALLEY; NORTH WASHINGTON → KLINES MILL; MEADOW BROOK; RIVERTON 2026-04-15 2026-07-17

Every mention

DateDocumentProjectWhat the document says about it
2026-09-18 SRRTEP Western
Item 01 - APS Supplemental Projects p. 3
Misoperation Relays No role wording
138 kV
2026-09-18 SRRTEP Western
Item 01 - APS Supplemental Projects p. 4
Misoperation Relays No role wording
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 26
Meadow Brook Substation “At Meadow Brook Substation:”
500/138 kV
2026-07-17 SRRTEP Western
Item 02 - APS Supplemental Projects p. 3
Misoperations Relay No role wording
138 kV
2026-06-17 SRRTEP Western
Item 03 - APS Supplemental Projects p. 11
Misoperation Relay Projects No role wording
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 11
Meadow Brook-West Winchester 138 kV “At Meadow Brook: • Install conduit and grounding for new equipment.”
138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 5
Meadow Brook-West Winchester 138 kV “At Meadow Brook:”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 27
Meadow Brook Substation “At Meadow Brook Substation:”
500/138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this