Substation Scout

Big Bass

Named in 3 PJM planning documents for 1 project, from September 9, 2025 to October 6, 2026.

Newdescribed as
PPLzone
230kVkV as printed
3mentions

Described as new: “Install a six bay BAAH 230kV switchyard” — source, page 27

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Big Bass, PA
PPL-2025-0012
Conceptual $186.875 M 05/30/2028 1,500 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2025-07-08 2025-09-09

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27
Big Bass, PA “Install a six bay BAAH 230kV switchyard”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 27
Big Bass, PA “Install a six bay BAAH 230kV switchyard”
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 10
Big Bass, PA “Install a six bay BAAH 230kV switchyard”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this