Substation Scout

Summerhill

Named in 4 PJM planning documents for 1 project, from October 18, 2024 to October 8, 2025.

Existingdescribed as
AEPzone
69kVkV as printed
4mentions

Also printed as: Summerhill station

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone M-3 Process Summerhill, OH
AEP-2024-OH015 · s3596.1
Conceptual $2.03 M 02/01/2027 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2025 RTEP p. 20
AEP Transmission Zone M-3 Process Summerhill, OH “replace the wood pole 2-way 69kV line switch with a new steel pole 3-way switch”
69kV
2025-10-08 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 21
AEP Transmission Zone M-3 Process Summerhill, OH “At Summerhill station, replace the wood pole 2-way 69kV line switch”
69kV
2024-12-13 SRRTEP Western
Item 17 - AEP Supplemental Projects p. 13
AEP Transmission Zone M-3 Process Summerhill, OH “At Summerhill station, replace”
69kV
2024-10-18 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 3
AEP Transmission Zone M-3 Process Summerhill, OH “Summerhill station was originally installed in 1977”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this