Named in 6 PJM planning documents for 4 projects, from November 6, 2024 to October 6, 2026.

Existingdescribed as
PPLzone
230kV, 69kVkV as printed
6mentions

Also printed as: Pocono 230kV Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Pocono area Evaluation Progress
b3908.1
Not printed $4.93M 10/30/2027 Not printed 2024-12-03
TEAC
Pocono area Evaluation Progress Not printed $4.93 10/30/2027 Not printed 2024-11-06
TEAC
Big Bass, PA
PPL-2025-0012
Conceptual $186.875 M 05/30/2028 1,500 MW 2026-10-06
TEAC
AVP3 Tap
PPL-2026-0014
Conceptual $4.6 M 03/31/2031 15 MW 2026-09-17
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2025-07-08 2025-09-09
In-service date 2/28/2028 → 03/31/2031 2026-03-18 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27
Big Bass, PA “Install a new DBDB (BAAH ultimate) bay at Pocono 230kV yard”
230kV
2026-09-17 SRRTEP Mid-Atlantic
Item 04 - PPL Supplemental Projects p. 7
AVP3 Tap No role wording
69kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 27
Big Bass, PA “Install a new DBDB (BAAH ultimate) bay at Pocono 230kV yard”
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 10
Big Bass, PA “Install a new DBDB (BAAH ultimate) bay at Pocono 230kV yard”
230kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 47
Pocono area Evaluation Progress “Install one 80 MVAr 230 kV capacitor bank at Pocono 230kV Substation”
230kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 49
Pocono area Evaluation Progress “Install one 80 MVAr 230 kV capacitor bank at Pocono 230kV Substation”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.