Named in 3 PJM planning documents for 1 project, from January 16, 2025 to October 8, 2025.

Existingdescribed as
PSEGzone
69kVkV as printed
3mentions

Also printed as: West Windsor Station

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PSE&G Transmission Zone M-3 Process South Brunswick
PSEG-2024-0005 · s3570
Engineering $3.4M 06/30/2026 35 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 06/2026 → 06/30/2026 2024-12-12 2025-01-16
Status conceptual (Conceptual) → engineering (Engineering and Planning) 2025-01-16 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2025 RTEP p. 5
PSE&G Transmission Zone M-3 Process South Brunswick “Cut and loop 69kV line from Ridge Road Station to West Windsor Station into customer’s new station.”
69kV
2025-10-08 TEAC
Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 5
PSE&G Transmission Zone M-3 Process South Brunswick “Cut and loop 69kV line from Ridge Road Station to West Windsor Station into customer’s new station.”
69kV
2025-01-16 SRRTEP Mid-Atlantic
Item 02 - PSEG Supplemental Projects p. 6
PSE&G Transmission Zone M-3 Process South Brunswick No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.