Sutton Substation
Named in 4 PJM planning documents for 4 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
5mentions
Also printed as: Sutton
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Misoperation Relay Projects APS-2023-036, APS-2023-041 to APS-2023-043, APS-2023-045 to APS-2023-049 |
Not printed | $2.2 M | 11/29/2024 | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2023-045 · s3111.1 |
Not printed | $1.5 M | 05/10/2024 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2023-049 · s3115.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| French Creek - Sutton 138 kV Line APS-2026-012 |
Conceptual | $119.57 M | 05/06/2033 | Not printed | 2026-10-16 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | FRANKLIN; PURSELY → ARMSTRONG; CABOT; EDGELAWN; FAIRVIEW; FRANKLIN; GILBOA; GRASSY FALLS; HOUSEVILLE; MCCALMONT; PRICE HILL; PRUNTYTOWN; PURSELY; SUTTON; TRISSLER | 2024-10-08 | Not reported |
| Substations named | FRENCH CREEK; HEATERS TAP; SUTTON → FRENCH CREEK; SUTTON | 2026-04-15 | 2026-10-16 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 14 |
French Creek - Sutton 138 kV Line | “At Sutton Substation: Remove wave trap, line turner and coax, and upgrade
substation conductor.” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 50 |
Misoperation Relay Projects | “At Sutton Substation, replace line trap and relaying” 138 kV |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 8 |
French Creek - Sutton 138 kV Line | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 50 |
Misoperation Relay Projects | “At Sutton Substation, replace line trap and relaying” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 51 |
Misoperation Relay Projects | “At Sutton Substation, replace circuit breaker, line trap
and relaying” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.