Windy Edge
Named in 10 PJM planning documents for 12 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
BGEzone
115kVkV as printed
38mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| BGE-2023-017 | Engineering | $0.7M | 11/4/2024 | Not printed | 2024-10-08 TEAC |
| BGE-2023-018 | Engineering | $0.7M | 10/10/2024 | Not printed | 2024-10-08 TEAC |
| Windy Edge Circuit Breaker B3 BGE-2024-006 · s3564.1 |
In service | $0.7M | 4/3/2025 | Not printed | 2025-10-08 TEAC |
| Windy Edge Circuit Breaker B4 BGE-2024-007 · s3565.1 |
Engineering | $0.7M | 5/8/2025 | Not printed | 2025-10-08 TEAC |
| Windy Edge Circuit Breaker B24 BGE-2024-008 · s3566.1 |
Engineering | $0.7M | 12/11/2025 | Not printed | 2025-10-08 TEAC |
| Windy Edge Circuit Breaker B28 BGE-2024-009 · s3567.1 |
Engineering | $0.7M | 10/2/2025 | Not printed | 2025-10-08 TEAC |
| Windy Edge Circuit Breaker B8 BGE-2025-003 · s3792 |
Engineering | $0.7M | 5/1/2028 | Not printed | 2026-10-06 TEAC |
| Windy Edge Circuit Breaker B9 BGE-2025-004 · s3793 |
In service | $0.7M | 4/10/2026 | Not printed | 2026-10-06 TEAC |
| Windy Edge Circuit Breaker B22 BGE-2025-005 · s3794 |
In service | $0.7M | 11/1/2027 | Not printed | 2026-10-06 TEAC |
| Windy Edge Circuit Breaker B29 BGE-2025-006 · s3795 |
In service | $0.7M | 5/21/2026 | Not printed | 2026-10-06 TEAC |
| Windy Edge Circuit Breaker B2 BGE-2025-009 |
Not printed | Not printed | Not printed | Not printed | 2025-11-13 SRRTEP Mid-Atlantic |
| Windy Edge Circuit Breaker B5 BGE-2025-010 |
Not printed | Not printed | Not printed | Not printed | 2025-11-13 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Status | engineering (Engineering) → in-service (In-service) | 2025-02-13 | 2025-10-08 |
| Substations named | WINDY EDGE → CRYSTAL SPRINGS; CRYSTAL SPRINGS TAP; DORSEY RUN; DORSEY TAP; HIGH RIDGE | 2025-08-14 | 2025-09-18 |
| Substations named | CRYSTAL SPRINGS; CRYSTAL SPRINGS TAP; DORSEY RUN; DORSEY TAP; HIGH RIDGE → WINDY EDGE | 2025-09-18 | 2025-11-13 |
| Status | engineering (Engineering) → in-service (In-service) | 2025-11-13 | 2026-10-06 |
| Substations named | WINDY EDGE → CEDAR PARK; JENNIFER RD | 2025-08-14 | 2025-09-18 |
| Substations named | CEDAR PARK; JENNIFER RD → WINDY EDGE | 2025-09-18 | 2025-11-13 |
| Status | engineering (Engineering) → in-service (In-service) | 2025-11-13 | 2026-10-06 |
| Status | engineering (Engineering) → in-service (In-service) | 2025-11-13 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - BGE Local Plan Submission of Supplemental Projects for 2026 p. 10 |
Windy Edge Circuit Breaker B9 | “Replace Windy Edge circuit breaker B9” 115kV |
| 2026-10-06 | TEAC Informational Only - BGE Local Plan Submission of Supplemental Projects for 2026 p. 12 |
Windy Edge Circuit Breaker B22 | “Replace Windy Edge circuit breaker B22” 115kV |
| 2026-10-06 | TEAC Informational Only - BGE Local Plan Submission of Supplemental Projects for 2026 p. 14 |
Windy Edge Circuit Breaker B29 | “Replace Windy Edge circuit breaker B29” 115kV |
| 2026-10-06 | TEAC Informational Only - BGE Local Plan Submission of Supplemental Projects for 2026 p. 8 |
Windy Edge Circuit Breaker B8 | “Replace Windy Edge circuit breaker B8” 115kV |
| 2026-10-01* | SRRTEP Mid-Atlantic BGE local plan submission for 2026 RTEP p. 10 |
Windy Edge Circuit Breaker B9 | “Replace Windy Edge circuit breaker B9” 115kV |
| 2026-10-01* | SRRTEP Mid-Atlantic BGE local plan submission for 2026 RTEP p. 12 |
Windy Edge Circuit Breaker B22 | “Replace Windy Edge circuit breaker B22” 115kV |
| 2026-10-01* | SRRTEP Mid-Atlantic BGE local plan submission for 2026 RTEP p. 14 |
Windy Edge Circuit Breaker B29 | “Replace Windy Edge circuit breaker B29” 115kV |
| 2026-10-01* | SRRTEP Mid-Atlantic BGE local plan submission for 2026 RTEP p. 8 |
Windy Edge Circuit Breaker B8 | “Replace Windy Edge circuit breaker B8” 115kV |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 16 |
BGE-2023-017 | “Replace Windy Edge circuit breaker B19” 115kV |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 18 |
BGE-2023-018 | “Replace Windy Edge circuit breaker B20” 115kV |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 10 |
Windy Edge Circuit Breaker B3 | “Replace Windy Edge circuit breaker B3” 115kV |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 12 |
Windy Edge Circuit Breaker B4 | “Replace Windy Edge circuit breaker B4” 115kV |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 14 |
Windy Edge Circuit Breaker B24 | “Replace Windy Edge circuit breaker B24” 115kV |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 16 |
Windy Edge Circuit Breaker B28 | “Replace Windy Edge circuit breaker B28” 115kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 10 |
Windy Edge Circuit Breaker B22 | “Replace Windy Edge circuit breaker B22” 115kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 12 |
Windy Edge Circuit Breaker B29 | “Replace Windy Edge circuit breaker B29” 115kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 3 |
Windy Edge Circuit Breaker B2 | “Windy Edge 115kV circuit breaker #B2 installed in 1971 is in deteriorating condition” 115kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 4 |
Windy Edge Circuit Breaker B5 | “Windy Edge 115kV circuit breaker #B5 installed in 1970 is in deteriorating condition” 115kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 6 |
Windy Edge Circuit Breaker B8 | “Replace Windy Edge circuit breaker B8” 115kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 8 |
Windy Edge Circuit Breaker B9 | “Replace Windy Edge circuit breaker B9” 115kV |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 10 |
Windy Edge Circuit Breaker B3 | “Replace Windy Edge circuit breaker B3” 115kV |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Windy Edge Circuit Breaker B4 | “Replace Windy Edge circuit breaker B4” 115kV |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 14 |
Windy Edge Circuit Breaker B24 | “Replace Windy Edge circuit breaker B24” 115kV |
| 2025-10-08 | TEAC Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 p. 16 |
Windy Edge Circuit Breaker B28 | “Replace Windy Edge circuit breaker B28” 115kV |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 3 |
Windy Edge Circuit Breaker B8 | “Windy Edge 115kV circuit breaker #B8 installed in 1971 is in deteriorating condition” 115kV |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 4 |
Windy Edge Circuit Breaker B9 | “Windy Edge 115kV circuit breaker #B9 installed in 1971 is in deteriorating condition” 115kV |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 5 |
Windy Edge Circuit Breaker B22 | “Windy Edge 115kV circuit breaker #B22 installed in 1971 is in deteriorating condition” 115kV |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 6 |
Windy Edge Circuit Breaker B29 | “Windy Edge 115kV circuit breaker #B29 installed in 1960 is in deteriorating condition” 115kV |
| 2025-02-13 | SRRTEP Mid-Atlantic Item 05 - BGE Supplemental Projects p. 11 |
Windy Edge Circuit Breaker B3 | “Replace Windy Edge circuit breaker B3” 115kV |
| 2025-02-13 | SRRTEP Mid-Atlantic Item 05 - BGE Supplemental Projects p. 13 |
Windy Edge Circuit Breaker B4 | “Replace Windy Edge circuit breaker B4” 115kV |
| 2025-02-13 | SRRTEP Mid-Atlantic Item 05 - BGE Supplemental Projects p. 15 |
Windy Edge Circuit Breaker B24 | “Replace Windy Edge circuit breaker B24” 115kV |
| 2025-02-13 | SRRTEP Mid-Atlantic Item 05 - BGE Supplemental Projects p. 17 |
Windy Edge Circuit Breaker B28 | “Replace Windy Edge circuit breaker B28” 115kV |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 10 |
Windy Edge Circuit Breaker B28 | “Windy Edge 115kV circuit breaker #B28 installed in 1968 is in deteriorating condition” 115kV |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 7 |
Windy Edge Circuit Breaker B3 | “Windy Edge 115kV circuit breaker #B3 installed in 1971 is in deteriorating condition” 115kV |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 8 |
Windy Edge Circuit Breaker B4 | “Windy Edge 115kV circuit breaker #B4 installed in 1971 is in deteriorating condition” 115kV |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 9 |
Windy Edge Circuit Breaker B24 | “Windy Edge 115kV circuit breaker #B24 installed in 1971 is in deteriorating condition” 115kV |
| 2024-10-08 | TEAC Informational Only - BGE Local Plan submission of supplemental project 2024 p. 16 |
BGE-2023-017 | “Replace Windy Edge circuit breaker B19” 115kV |
| 2024-10-08 | TEAC Informational Only - BGE Local Plan submission of supplemental project 2024 p. 18 |
BGE-2023-018 | “Replace Windy Edge circuit breaker B20” 115kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.