Substation Scout

Hardy

Named in 6 PJM planning documents for 4 projects, from October 8, 2024 to October 8, 2025.

Existingdescribed as
APSzone
138 kVkV as printed
10mentions

Also printed as: Hardy Substation · Hardy 138 kV substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
APS-2023-004 Not printed $ 42.6 M 12/1/2027 Not printed 2024-10-08
TEAC
APS-2023-005 Not printed $ 45.8 M 6/1/2026 Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2023-067, APS-2023-068 · s3357.1, s3358.1
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Hardy – North Petersburg 138 kV Line
APS-2025-008 · s3668.1
Not printed $5.20M 7/26/2025 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named HARDY; PAGE; SPERRYVILLE → HARDY; PAGE 2024-10-08 Not reported
Substations named BEVERLY TAP; DURBIN TAP; HARDY; JUNCTION; LOUGHS LANE; PICKENS → HARDY; JUNCTION; LOUGHS LANE; PICKENS 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 83
APS-2023-004 “Replace limiting substation conductor at Hardy 138 kV substation”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 85
APS-2023-005 “Replace limiting substation conductor, wave trap, and circuit switcher at Hardy 138 kV substation”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 91
Misoperation Relay Projects “At Hardy Substation, replace circuit breaker, disconnect switches, substation conductor and relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 24
Hardy – North Petersburg 138 kV Line “At Hardy Substation, replace circuit breaker”
138 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 24
Hardy – North Petersburg 138 kV Line “At Hardy Substation, replace circuit breaker, disconnect switches”
138 kV
2025-05-16 SRRTEP Western
Item 06 - APS Supplemental Project p. 11
Hardy – North Petersburg 138 kV Line “At Hardy Substation, replace circuit breaker”
138 kV
2025-03-14 SRRTEP Western
Item 07 - APS Supplemental Project p. 8
Hardy – North Petersburg 138 kV Line No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 83
APS-2023-004 “Replace limiting substation conductor at Hardy 138 kV substation”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 85
APS-2023-005 “Replace limiting substation conductor, wave trap, and circuit switcher at Hardy 138 kV substation”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 91
Misoperation Relay Projects “At Hardy Substation, replace circuit breaker, disconnect switches, substation conductor and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this