Franklin

Named in 6 PJM planning documents for 5 projects, from October 8, 2024 to April 14, 2026.

Existingdescribed as
JCPLzone
115 kV, 115-34.5 kV, 34.5 kVkV as printed
9mentions

Also printed as: Franklin Substation · Franklin 34.5 kV Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Branchville – Franklin 34.5 kV Q745 Line Customer Connection
JCPL-2022-004 · s3437.1
Not printed $0.8M 06/02/2025 Not printed 2024-10-08
TEAC
Franklin Substation
JCPL-2023-006, JCPL-2023-042 · s3299.1, s3299.2, s3299.3, s3299.4, s3252.1
Not printed $32.0 M 12/31/2025 67 MW 2024-10-08
TEAC
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer
JCPL-2024-025 · s3612.1
Not printed $7M 8/31/2029 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Franklin No. 1 115-34.5 kV Transformer
JCPL-2024-036 · s3636.1
Not printed $6M 12/28/2029 Not printed 2025-10-08
TEAC
Cozy Lake - Franklin 34.5 kV S747 Line
JCPL-2026-013
Not printed Not printed Not printed Not printed 2026-04-14
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FRANKLIN → BRANCHVILLE; FRANKLIN 2024-10-08 Not reported
Substations named FRANKLIN; VERNON; WEST WHARTON SUBSTATIONS → FRANKLIN; VERNON; WEST WHARTON 2024-10-08 Not reported
Substations named VERNON → FRANKLIN; VERNON; WEST WHARTON 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 17
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer No role wording
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 29
Franklin No. 1 115-34.5 kV Transformer “Replace 115-34.5 kV Transformer No.1 at Franklin Substation”
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 103
Branchville – Franklin 34.5 kV Q745 Line Customer Connection “anticipated load is 10 MVA near the Franklin 34.5 kV Substation”
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 20
Franklin Substation “Construct an 11 breaker 115 kV breaker-and-a-half substation”
115 kV
2026-04-14 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 3
Cozy Lake - Franklin 34.5 kV S747 Line No role wording
34.5 kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 29
Franklin No. 1 115-34.5 kV Transformer “Replace 115-34.5 kV Transformer No.1 at Franklin Substation”
115-34.5 kV
2025-04-10 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 8
Franklin No. 1 115-34.5 kV Transformer “Replace 115-34.5 kV Transformer No.1 at Franklin Substation”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 103
Branchville – Franklin 34.5 kV Q745 Line Customer Connection No role wording
34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 20
Franklin Substation “At Franklin Substation: – Construct an 11 breaker 115 kV breaker-and-a-half substation”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.