Frackville
Named in 10 PJM planning documents for 9 projects, from April 1, 2025 to October 6, 2026.
PJM interconnection queue
A PJM queue substation page has the same name: Frackville (PA) — 3 queue requests filed, 0 active.
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Frackville, PA PPL-2019-0004 |
Conceptual | $45 M | 06/30/2028 | Not printed | 2026-10-06 TEAC |
| Hauto, PA PPL-2025-0002 |
Conceptual | $101 M | 05/30/2028 | 350 MW | 2025-04-01 TEAC |
| Gordon, PA PPL-2025-0008 |
Conceptual | $231.65 M | 05/30/2028 | 600MW | 2026-10-06 TEAC |
| Girardville, PA PPL-2025-0016 |
Conceptual | $0.7 M | 02/28/2027 | Not printed | 2026-10-06 TEAC |
| Fountain Springs, PA PPL-2025-0028 |
Conceptual | $1.6 M | 11/30/2028 | Not printed | 2026-10-06 TEAC |
| PPL Transmission Zone: Supplemental
Port Carbon, PA PPL-2026-0026 |
Conceptual | $7.2 M | 11/30/2028 | Not printed | 2026-10-06 TEAC |
| Natalie 500-230kV Substation PPL-2026-0029 |
Conceptual | $408 M | 12/30/2029 | 2,000 MW | 2026-09-08 TEAC |
| Frackville 230kV yard PPL-2026-0040 |
Conceptual | $36.3 M | 05/30/2029 | 750 MW | 2026-10-06 TEAC |
| Lansford Tap PPL-2026-0042 |
Conceptual | $1.9 M | 12/01/2029 | Not printed | 2026-09-17 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 05/2027 → 05/30/2028 | 2025-03-04 | 2025-04-01 |
| In-service date | 05/2027 → 5/30/2027 | 2025-05-06 | 2025-10-08 |
| In-service date | 5/30/2027 → 05/30/2028 | 2025-10-08 | 2026-10-06 |
| In-service date | 11/2028 → 11/30/2028 | 2025-12-11 | 2026-02-12 |
| Substations named | FOUNTAIN SPRINGS → FOUNTAIN SPRINGS; FOUNTAIN SPRINGS CREEK; FRACKVILLE | 2025-12-11 | 2026-02-12 |
| Substations named | FOUNTAIN SPRINGS; FOUNTAIN SPRINGS CREEK; FRACKVILLE → FOUNTAIN SPRINGS; FOUNTAIN SPRINGS CREEK; FRACKVILLE; MOWRY | 2026-02-12 | 2026-10-06 |
| Substations named | PORT CARBON → FRACKVILLE; ORWIGSBURG; PORT CARBON | 2026-03-18 | 2026-05-14 |
| In-service date | 06/2028 → 12/30/2029 | 2026-04-07 | 2026-09-08 |
| In-service date | 05/2029 → 05/30/2029 | 2026-08-04 | 2026-10-06 |
| Substations named | LANSFORD → FRACKVILLE; LANSFORD; SIEGFRIED | 2026-08-13 | 2026-09-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Item 12 - PPL Supplemental Projects - Presentation p. 9 |
Frackville 230kV yard | “Frackville 230kV Yard
• Install three BAAH 230kV bays with an 80MVAR Capacitor bank.” 230kV |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 25 |
Gordon, PA | “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in bay #3 at Frackville 230kV Yard” 230kV |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 39 |
Fountain Springs, PA | No role wording |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 4 |
Frackville, PA | No role wording |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 73 |
PPL Transmission Zone: Supplemental Port Carbon, PA | No role wording |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 9 |
Girardville, PA | No role wording |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 13 |
Lansford Tap | No role wording 69kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 25 |
Gordon, PA | “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in bay
#3 at Frackville 230kV Yard” 230kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 39 |
Fountain Springs, PA | No role wording 69kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 4 |
Frackville, PA | No role wording 69kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 73 |
PPL Transmission Zone: Supplemental Port Carbon, PA | No role wording 69kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 9 |
Girardville, PA | “existing Frackville-Siegfried 2 69kV line” 69kV |
| 2026-09-08 | TEAC Item 07 - PPL Supplemental Projects p. 4 |
Natalie 500-230kV Substation | “Install a 230kV line terminal and one 230kV breaker” 230kV |
| 2026-05-14 | SRRTEP Mid-Atlantic Item 08 - PPL Supplemental Projects p. 16 |
PPL Transmission Zone: Supplemental Port Carbon, PA | No role wording 69kV |
| 2026-02-12 | SRRTEP Mid-Atlantic Item 05 - PPL Supplemental Projects p. 14 |
Fountain Springs, PA | “Frackville 69kV Substation” 69kV |
| 2025-10-08 | TEAC Item 09 - PPL Supplemental Projects p. 6 |
Gordon, PA | “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in bay #3 at Frackville 230kV Yard” 230kV |
| 2025-06-12 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 4 |
Frackville, PA | No role wording 69kV |
| 2025-04-01 | TEAC Item 07 - PPL Supplemental Projects p. 6 |
Hauto, PA | “Install additional 69kV terminals at Frackville 69kV yard” 69kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.