Midlothian

Named in 10 PJM planning documents for 7 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
230 kV, 230kV, 500 kVkV as printed
10mentions

Also printed as: Midlothian substation

PJM interconnection queue

A PJM queue substation page has the same name: Midlothian (VA) — 5 queue requests filed, 4 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation
B4000.355 – B4000.359
Not printed $1,109.89M 6/1/2029 Not printed 2026-04-07
TEAC
Regional Solution: 2025-W1-275 Portfolio
b4053.1
Not printed $4832.45 6/1/2032 Not printed 2026-01-06
TEAC
Ironbridge Sub – Upgrade TX#2 and Install Ring Bus
DOM-2023-0042 · s3501.1
Engineering $10.3 M 09/01/2025 Not printed 2024-10-08
TEAC
Duval 230kV Delivery - DEV
DOM-2024-0031 · s3677
Engineering $30.0M Substation, $80M Transmission Lines 1/1/2028 76.9 MW 2025-10-08
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2024-0036-DNH (Update)
Conceptual $212M Q4 2031 Not printed 2026-10-06
TEAC
West Creek 230kV Delivery - DEV
DOM-2025-0054
Conceptual $35M 07/26/2028 100 MW 2026-01-06
TEAC
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio
2025-W1-275
Not printed Not printed 6/1/2032 Not printed 2025-12-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$1,055.3 M → $1,109.89M 2025-01-07 2025-01-07
Cost estimate
prior value printed on the same page
$1,109.89M → $978.76 M 2026-08-04 2026-08-04
Cost estimate $1,109.89M → $978.76 M 2026-05-08 2026-08-04
Substations named BRISTERS; ELK RUN; JOSHUA FALLS; MEADOWBROOK; VINT HILL; YEAT → BRISTERS; CULPEPER YEAT; CUNNINGHAM; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MIDLOTHIAN; MORRISVILLE; MOSBY; NOKESVILLE; NORTH ANNA; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT 2025-01-07 2026-04-07
Substations named BRISTERS; CULPEPER YEAT; CUNNINGHAM; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MIDLOTHIAN; MORRISVILLE; MOSBY; NOKESVILLE; NORTH ANNA; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT → ANDERSON BRANCH; BRISTERS; CULPEPER YEAT; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MORRISVILLE; MOSBY; NOKESVILLE; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT 2026-04-07 2026-05-08
Substations named ANDERSON BRANCH; BRISTERS; CULPEPER YEAT; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MORRISVILLE; MOSBY; NOKESVILLE; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT → BRISTERS; CLOVERDALE; ELK RUN; JOSHUA FALLS; MEADOWBROOK; VINT HILL; YEAT 2026-05-08 2026-08-04
Substations named DUVAL; MIDLOTHIAN; WINTERPOCK → DUVAL; MIDLOTHIAN 2025-02-04 2025-10-08
In-service date 1/2/2029 → 07/26/2028 2025-10-08 2026-01-06
Substations named WEST CREEK → MIDLOTHIAN; NORTH POLE; ROCKVILLE; SHORT PUMP; WEST CREEK 2025-10-08 2026-01-06
Substations named MIDLOTHIAN; NORTH POLE; ROCKVILLE; SHORT PUMP; WEST CREEK → ROCKVILLE; SHORT PUMP; WEST CREEK 2026-01-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 14 - DOM Supplemental Projects - Presentation p. 6
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Midlothian-Bremo to current 230 kV standards”
230 kV
2026-09-08* SRRTEP Southern
Dominion p. 168
Ironbridge Sub – Upgrade TX#2 and Install Ring Bus “Line #282 from Midlothian to Spruance NUG”
2026-07-07 TEAC
Item 14 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2026-04-07 TEAC
Item 11 - Reliability Analysis Update p. 16
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation No role wording
500 kV
2026-01-06 TEAC
Item 07 - DOM Supplemental Projects p. 13
West Creek 230kV Delivery - DEV No role wording
230kV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 29
Regional Solution: 2025-W1-275 Portfolio “Uprate terminal equipment at Midlothian to 5000 A.”
500 kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 78
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio “Uprate terminal equipment at Midlothian to 5000 A.”
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 33
Duval 230kV Delivery - DEV “extending two new 230kV lines from Midlothian substation”
230kV
2025-02-04 TEAC
Item 11 - Dominion Supplemental Projects p. 4
Duval 230kV Delivery - DEV “lines from Midlothian substation”
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 168
Ironbridge Sub – Upgrade TX#2 and Install Ring Bus No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.