Shenango
Named in 5 PJM planning documents for 3 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
ATSIzone
345 kV, 69 kVkV as printed
5mentions
Also printed as: Shenango Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Old Plank 69 kV Ring Bus ATSI-2019-070 |
Conceptual | $12.6 M | 12/29/2028 | Not printed | 2026-10-16 SRRTEP Western |
| Masury 138 kV Misoperation Relays ATSI-2023-019 · s3118.1 |
Not printed | $3.4M | 12/31/2025 | Not printed | 2024-10-08 TEAC |
| Niles – Shenango 345 kV Line ATSI-2024-006 · s3714.1 |
Not printed | $73.92M | 12/17/2027 | Not printed | 2025-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | LINCOLN PARK; MASURY; SHENANGO → LINCOLN PARK; MASURY | 2024-10-08 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 7 |
Old Plank 69 kV Ring Bus | “construction of the Shenango 69 kV switching station” 69 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 42 |
Niles – Shenango 345 kV Line | “At Shenango Substation:
▪ Replace line relaying” 345 kV |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 42 |
Niles – Shenango 345 kV Line | “At Shenango Substation:
§ Replace line relaying” 345 kV |
| 2025-07-08 | TEAC Item 03 - ATSI Supplemental Projects p. 4 |
Niles – Shenango 345 kV Line | “At Shenango Substation: § Replace line relaying” |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 16 |
Masury 138 kV Misoperation Relays | No role wording |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.