Substation Scout

Woodspoint

Named in 4 PJM planning documents for 1 project, from March 14, 2025 to November 14, 2025.

Not stateddescribed as
DEOKzone
138 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Turfway
DEOK-2024-004 · s3600.1
Conceptual $15.8M 07/26/2028 Not printed 2025-11-14
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $15.8M → $13M 2025-11-14 Not reported
Cost estimate
prior value printed on the same page
$13M → $15.8M 2025-11-14 2025-11-14
Cost estimate $13M → $15.8M 2025-10-08 2025-11-14
In-service date 07/26/2028 → 07/25/2029 2025-11-14 Not reported
In-service date 07-25-2029 → 07/25/2029 2025-03-14 2025-10-08
In-service date 07/25/2029 → 07/26/2028 2025-10-08 2025-11-14
Substations named AERO; CONSTANCE; LIMABURG; OAKBROOK; TURFWAY → AERO; CONSTANCE; DONALDSON; LIMABURG; OAKBROOK; TURFWAY; WOODSPOINT 2025-02-14 2025-03-14

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
DEOK local plan submission of the supplemental projects for 2025 RTEP p. 7
Turfway No role wording
138 kV
2025-11-14 SRRTEP Western
Item 05 - DEOK Supplemental Projects p. 3
Turfway No role wording
138 kV
2025-10-08 TEAC
Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 7
Turfway No role wording
138 kV
2025-03-14 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 6
Turfway No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this