Burches Hill
Named in 6 PJM planning documents for 4 projects, from December 8, 2025 to October 6, 2026.
Existingdescribed as
PEPCOzone
230 kV, 230kVkV as printed
8mentions
Also printed as: Burches Hill substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Burches Hill 230kV 3A Breaker Replacement PEP-2023-016 · s3532.1 |
In service | $810k | 5/3/24 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| Burches Hill 230kV 3B Breaker Replacement PEP-2023-017 · s3533.1 |
In service | $810k | 5/3/24 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| Burches Hill PEP-2023-023 · s3822 |
Engineering | $3.6M | 2/12/2027 | Not printed | 2026-10-06 TEAC |
| PEP-2026-001 | Engineering | $0.5M | 5/17/2026 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BURCHES HILL; PALMERS CORNER → BURCHES HILL; PALMER CORNER; PALMERS CORNER | 2026-03-10 | 2026-04-07 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - PEPCO Local Plan Submission of Supplemental Projects for 2026 p. 4 |
Burches Hill | “Replace the existing 230kV oil circuit breakers 2A, 2C, 3C and 4C at Burches Hill” 230kV |
| 2026-10-06 | TEAC Informational Only - PEPCO Local Plan Submission of Supplemental Projects for 2026 p. 6 |
PEP-2026-001 | “Upgrade Burches Hill – Palmer Corner relays and associated relay settings.” 230 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2026 RTEP p. 4 |
Burches Hill | “Replace the existing 230kV oil circuit breakers 2A, 2C, 3C and 4C at Burches Hill” 230kV |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 17 |
Burches Hill 230kV 3A Breaker Replacement | “230kV circuit breaker 3A at Burches Hill substation was installed in 1979” 230kV |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 19 |
Burches Hill 230kV 3B Breaker Replacement | “230kV circuit breaker 3B at Burches Hill substation was installed in 1979” 230kV |
| 2026-04-07 | TEAC Item 07 - PEPCO Supplemental Projects p. 3 |
PEP-2026-001 | “Upgrade Burches Hill – Palmer Corner relays” 230 kV |
| 2026-03-10 | TEAC Item 07 - PEPCO Supplemental Projects p. 3 |
PEP-2026-001 | No role wording 230 kV |
| 2025-12-08 | TEAC Item 07 - PEPCO Supplemental Projects p. 4 |
Burches Hill | “Replace the existing 230kV oil circuit breakers 2A, 2C, 3C and 4C at
Burches Hill” 230kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.