Glendon

Named in 4 PJM planning documents for 2 projects, from January 16, 2025 to October 6, 2026.

Existingdescribed as
METEDzone
115 kVkV as printed
4mentions

PJM interconnection queue

A PJM queue substation page has the same name: Glendon (PA) — 2 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Hosensack Substation
ME-2024-006
Conceptual $39.36 M 12/31/2030 Not printed 2026-10-06
TEAC
Belfast Substation
ME-2024-014 · s3626.1
Not printed $14.3M 6/1/2028 78 MW 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 09 - MetEd Supplemental Projects - Presentation p. 4
Hosensack Substation “At Glendon: Revise relay settings Replace substation conductor”
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2025 RTEP p. 13
Belfast Substation “Update relaying at North Bangor and Glendon substations.”
115 kV
2025-10-08 TEAC
Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 p. 13
Belfast Substation “Update relaying at North Bangor and Glendon substations.”
115 kV
2025-01-16 SRRTEP Mid-Atlantic
Item 01 - MetEd Supplemental Projects p. 4
Belfast Substation “Update relaying at North Bangor and Glendon substations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.