Substation Scout

Nokesville

Named in 9 PJM planning documents for 7 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
230 kV, 230kVkV as printed
13mentions

Also printed as: Nokesville Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Nokesville – Hornbaker Bristow New 230kV Line
b4000.322 – b4000.324
Not printed $18.14M 6/1/2029 Not printed 2026-10-06
TEAC
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation
B4000.355 – B4000.359
Not printed $1,109.89M 6/1/2029 Not printed 2026-05-08
TEAC
Nokesville - Add 2nd TX - DEV
DOM-2021-0018 · s2620
Engineering $0.75 M 11/01/2022 63.3 MW 2024-10-08
TEAC
Do No Harm (DNH) Analysis
DOM-2022-0045-DNH · s3035.2
Conceptual $139.0M 12/31/2027 Not printed 2024-10-08
TEAC
Do No Harm (DNH) Analysis
DOM-2022-0046-DNH & DOM-2022-0047-DNH Update
Conceptual $37.5M 12/31/2027 Not printed 2026-10-06
TEAC
Bristow 230kV Delivery – NOVEC
DOM-2024-0063 · s3699
Engineering $14.0M 04/30/2028 213.0 MW 2025-10-08
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2024-0063-DNH
Conceptual $24.0M 06/01/2029 Not printed 2025-05-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$1,055.3 M → $1,109.89M 2025-01-07 2025-01-07
Cost estimate
prior value printed on the same page
$1,109.89M → $978.76 M 2026-08-04 2026-08-04
Cost estimate $1,109.89M → $978.76 M 2026-05-08 2026-08-04
Substations named BRISTERS; ELK RUN; JOSHUA FALLS; MEADOWBROOK; VINT HILL; YEAT → BRISTERS; CULPEPER YEAT; CUNNINGHAM; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MIDLOTHIAN; MORRISVILLE; MOSBY; NOKESVILLE; NORTH ANNA; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT 2025-01-07 2026-04-07
Substations named BRISTERS; CULPEPER YEAT; CUNNINGHAM; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MIDLOTHIAN; MORRISVILLE; MOSBY; NOKESVILLE; NORTH ANNA; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT → ANDERSON BRANCH; BRISTERS; CULPEPER YEAT; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MORRISVILLE; MOSBY; NOKESVILLE; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT 2026-04-07 2026-05-08
Substations named ANDERSON BRANCH; BRISTERS; CULPEPER YEAT; ELK RUN; ELMONT; JOSHUA FALLS; KRAKEN; MEADOWBROOK; MORRISVILLE; MOSBY; NOKESVILLE; POSSUM PT; SPOTSYLVANIA; VINT HILL; VONTAY; WISHING STAR; YEAT → BRISTERS; CLOVERDALE; ELK RUN; JOSHUA FALLS; MEADOWBROOK; VINT HILL; YEAT 2026-05-08 2026-08-04
Substations named BRISTERS; HORNBAKER; NOKESVILLE; VINT HILL → BRICKYARD; BRISTERS; CLIFTON; DAWKINS BRANCH; GAINESVILLE; HORNBAKER; NOKESVILLE; RAILROAD; VINT HILL 2024-10-08 Not reported
Cost estimate $37.5M → $23.0M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$115.0M → $114.0M 2024-10-08 2024-10-08
Cost estimate $114.0M → $37.5M 2024-10-08 2026-10-06
Cost estimate
prior value printed on the same page
$23 → $37.5M 2026-10-06 2026-10-06
Substations named ANDERSON BRANCH; BRISTERS; NOKESVILLE → BRISTERS; LIBERTY; LOUDOUN; MEADOWBROOK; MORRISVILLE; NOKESVILLE; REMINGTON CT; ROLLINS FORD; VINT HILL; WHEELER; WISHING STAR 2026-10-06 Not reported
Substations named BRISTERS; LIBERTY; LOUDOUN; MEADOWBROOK; MORRISVILLE; NOKESVILLE; REMINGTON CT; ROLLINS FORD; VINT HILL; WHEELER; WISHING STAR → ANDERSON BRANCH; BRISTERS; NOKESVILLE 2024-10-08 2026-10-06
Substations named BRICKYARD; CLIFTON; DEVLIN; GAINESVILLE; NOKESVILLE; RAILROAD; ROLLINS FORD; VINT HILL; WHEELER → DEVLIN; GAINESVILLE; VINT HILL; WHEELER 2025-05-06 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 14 - DOM Supplemental Projects - Presentation p. 3
Do No Harm (DNH) Analysis No role wording
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 11
Nokesville – Hornbaker Bristow New 230kV Line “upgrades at Nokesville and Bristow 230kV substations”
230kV
2026-09-08* SRRTEP Southern
Dominion p. 10
Nokesville - Add 2nd TX - DEV “add a 2 nddistribution transformer at Nokesville Substation”
2026-09-08* SRRTEP Southern
Dominion p. 61
Do No Harm (DNH) Analysis “at the existing Nokesville Substation”
230 kV
2026-09-08* SRRTEP Southern
Dominion p. 81
Do No Harm (DNH) Analysis No role wording
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 18
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation No role wording
2026-04-07 TEAC
Item 11 - Reliability Analysis Update p. 14
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation No role wording
230kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 15
Bristow 230kV Delivery – NOVEC “between Nokesville and Hornbaker Substations”
230 kV
2025-05-06 TEAC
Item 09 - DOM Supplemental Projects p. 13
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 13
Bristow 230kV Delivery – NOVEC “the termination of the 230 kV line between Nokesville and Hornbaker Substations (DOM-2022-0045-DNH) will be reconfigured”
230 kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 10
Nokesville - Add 2nd TX - DEV “add a 2nddistribution transformer at Nokesville Substation”
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 61
Do No Harm (DNH) Analysis “Install a 230 kV ring bus and associated 230 kV equipment (breakers, switches, leads) at the existing Nokesville Substation.”
230 kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 84
Do No Harm (DNH) Analysis “terminations of line #2101 (Bristers – Vint Hill) into Nokesville Substation”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this