Substation Scout

Bradford

Named in 6 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
PECOzone
230 kVkV as printed
8mentions

PJM interconnection queue

A PJM queue substation page has the same name: Bradford (PA) — 2 queue requests filed, 1 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
220-31 Planebrook – Bradford 230 kV Line Rebuild
PE-2024-002 · s3384.1
Conceptual $36M 12/31/27 Not printed 2024-10-08
TEAC
220-02 Planebrook – Bradford 230 kV Line Rebuild
PE-2024-003 · s3385.1
Conceptual $36M 12/31/28 Not printed 2024-10-08
TEAC
New Business Customer
PE-2024-008 · s3730.1 (Phase 1), s3730.2 (Phase 2)
Conceptual $7M 9/30/26 (Phase 1), 6/30/28 (Phase 2) 290MW 2026-10-06
TEAC
Limerick
PE-2026-001
Engineering $2 million 12/21/2026 Not printed 2026-08-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/31/2026 (Phase 1), 12/31/2027 (Phase 2) → 9/30/26 (Phase 1), 6/30/28 (Phase 2) 2025-03-04 2026-10-06
Substations named NEWLINVILLE → BRADFORD; MITTAL STEEL; NEWLINVILLE; PEACH BOTTOM 2026-01-06 2026-08-04

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PECO Local Plan Submission of Supplemental Projects for 2026 p. 3
New Business Customer No role wording
2026-10-01* SRRTEP Mid-Atlantic
PECO local plan submission for 2026 RTEP p. 3
New Business Customer No role wording
2026-09-08* SRRTEP Mid-Atlantic
PECO local plan submission for 2024 RTEP p. 11
220-31 Planebrook – Bradford 230 kV Line Rebuild “Replace various substation equipment at Planebrook and Bradford substations”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
PECO local plan submission for 2024 RTEP p. 13
220-02 Planebrook – Bradford 230 kV Line Rebuild “Replace various substation equipment at Planebrook and Bradford substations”
230 kV
2026-08-04 TEAC
Item 09 - PECO Supplemental Projects p. 7
Limerick No role wording
230 kV
2025-03-04 TEAC
Item 10 - PECO Supplemental Projects p. 6
New Business Customer No role wording
2024-10-08 TEAC
Informational Only - PECO Local Plan submission of supplemental project 2024 p. 10
220-31 Planebrook – Bradford 230 kV Line Rebuild “Replace various substation equipment at Planebrook and Bradford substations”
230 kV
2024-10-08 TEAC
Informational Only - PECO Local Plan submission of supplemental project 2024 p. 12
220-02 Planebrook – Bradford 230 kV Line Rebuild “Replace various substation equipment at Planebrook and Bradford substations”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this