Bells Mill

Named in 3 PJM planning documents for 3 projects, from December 8, 2025 to January 6, 2026.

Existingdescribed as
PEPCOzone
138kV, 230/138 kVkV as printed
3mentions

Also printed as: Bells Mill · Bells Mill substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Exelon/PEPCO Cluster
b4052.1
Not printed $282.16 M 6/1/2032 Not printed 2026-01-06
TEAC
Bells Mill 138kV 8BT Breaker Replacement
PEP-2023-005 · s3539.1
Engineering $675k 10/01/25 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
PEPCO Transmission Zone: Baseline Exelon/PEPCO Cluster
2025-W1-919
Not printed $282.16 M 6/1/2031 Not printed 2025-12-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PEPCO local plan submission for 2024 RTEP p. 31
Bells Mill 138kV 8BT Breaker Replacement “138kV circuit breaker 8BT at Bells Mill substation was installed in 1977”
138kV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 25
Exelon/PEPCO Cluster “Replace Bells Mill T3 XF with new PEPCO standard 260 MVA 230/138 kV Transformer”
230/138 kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 60
PEPCO Transmission Zone: Baseline Exelon/PEPCO Cluster “Replace Bells Mill T3 XF with new PEPCO standard 260 MVA 230/138 kV Transformer”
230/138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.