Turfway
Named in 5 PJM planning documents for 1 project, from February 14, 2025 to November 14, 2025.
Newdescribed as
DEOKzone
138 kV, 138/34 kVkV as printed
5mentions
Described as new: “Build a new substation, Turfway” — source, page 6
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Turfway DEOK-2024-004 · s3600.1 |
Conceptual | $15.8M | 07/26/2028 | Not printed | 2025-11-14 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate | $15.8M → $13M | 2025-11-14 | Not reported |
| Cost estimate prior value printed on the same page |
$13M → $15.8M | 2025-11-14 | 2025-11-14 |
| Cost estimate | $13M → $15.8M | 2025-10-08 | 2025-11-14 |
| In-service date | 07/26/2028 → 07/25/2029 | 2025-11-14 | Not reported |
| In-service date | 07-25-2029 → 07/25/2029 | 2025-03-14 | 2025-10-08 |
| In-service date | 07/25/2029 → 07/26/2028 | 2025-10-08 | 2025-11-14 |
| Substations named | AERO; CONSTANCE; LIMABURG; OAKBROOK; TURFWAY → AERO; CONSTANCE; DONALDSON; LIMABURG; OAKBROOK; TURFWAY; WOODSPOINT | 2025-02-14 | 2025-03-14 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2025 RTEP p. 7 |
Turfway | “Build a new substation, Turfway” 138/34 kV |
| 2025-11-14 | SRRTEP Western Item 05 - DEOK Supplemental Projects p. 3 |
Turfway | “Build a new substation, Turfway” 138 kV |
| 2025-10-08 | TEAC Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 7 |
Turfway | “Build a new substation, Turfway” 138/34 kV |
| 2025-03-14 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 6 |
Turfway | “Build a new substation, Turfway” 138/34 kV |
| 2025-02-14 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 6 |
Turfway | “Build a new substation, Turfway” 138/34 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.