Pumphrey

Named in 4 PJM planning documents for 7 projects, from October 8, 2024 to December 3, 2024.

Existingdescribed as
BGEzone
115kV, 230 kVkV as printed
12mentions

PJM interconnection queue

A PJM queue substation page has the same name: Pumphrey (MD) — 4 queue requests filed, 1 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
BGE Local N-1-1
b3906.1
Not printed $107.62M 06/01/2029 Not printed 2024-12-03
TEAC
BGE Local N-1-1 Not printed Not printed Not printed Not printed 2024-11-06
TEAC
BGE-2023-010 In service $0.7M 4/5/2024 Not printed 2024-10-08
TEAC
BGE-2023-011 Engineering $0.7M 5/10/2024 Not printed 2024-10-08
TEAC
BGE-2023-012 Engineering $0.7M 6/13/2024 Not printed 2024-10-08
TEAC
BGE-2023-013 Engineering $0.7M 11/28/2024 Not printed 2024-10-08
TEAC
BGE-2023-014 Engineering $0.7M 10/18/2024 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $107.62M → 122.07 2024-12-03 2026-10-06
Cost estimate
prior value printed on the same page
107.62 → 122.07 2026-10-06 2026-10-06
Substations named CHESTNUT HILL; FREDERICK RD; HOWARD; MARLEY NECK; NORTH EAST; PUMPHREY; WAGNER → MARLEY NECK 2024-12-03 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
BGE local plan submission for 2024 RTEP p. 10
BGE-2023-014 “Replace Pumphrey circuit breaker B9”
115kV
2026-09-08* SRRTEP Mid-Atlantic
BGE local plan submission for 2024 RTEP p. 2
BGE-2023-010 “Replace Pumphrey circuit breaker B4”
115kV
2026-09-08* SRRTEP Mid-Atlantic
BGE local plan submission for 2024 RTEP p. 4
BGE-2023-011 “Replace Pumphrey circuit breaker B5”
115kV
2026-09-08* SRRTEP Mid-Atlantic
BGE local plan submission for 2024 RTEP p. 6
BGE-2023-012 “Replace Pumphrey circuit breaker B6”
115kV
2026-09-08* SRRTEP Mid-Atlantic
BGE local plan submission for 2024 RTEP p. 8
BGE-2023-013 “Replace Pumphrey circuit breaker B7”
115kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 42
BGE Local N-1-1 No role wording
230 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 42
BGE Local N-1-1 No role wording
230 kV
2024-10-08 TEAC
Informational Only - BGE Local Plan submission of supplemental project 2024 p. 10
BGE-2023-014 “Replace Pumphrey circuit breaker B9”
115kV
2024-10-08 TEAC
Informational Only - BGE Local Plan submission of supplemental project 2024 p. 2
BGE-2023-010 “Replace Pumphrey circuit breaker B4”
115kV
2024-10-08 TEAC
Informational Only - BGE Local Plan submission of supplemental project 2024 p. 4
BGE-2023-011 “Replace Pumphrey circuit breaker B5”
115kV
2024-10-08 TEAC
Informational Only - BGE Local Plan submission of supplemental project 2024 p. 6
BGE-2023-012 “Replace Pumphrey circuit breaker B6”
115kV
2024-10-08 TEAC
Informational Only - BGE Local Plan submission of supplemental project 2024 p. 8
BGE-2023-013 “Replace Pumphrey circuit breaker B7”
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.