Substation Scout

Paupack

Named in 5 PJM planning documents for 3 projects, from June 5, 2025 to October 6, 2026.

Existingdescribed as
PPLzone
230kVkV as printed
7mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Callender Gap, PA
PPL-2025-0005
Conceptual $73.5 M 05/30/2028 500 MW 2026-10-06
TEAC
Big Bass, PA
PPL-2025-0012
Conceptual $186.875 M 05/30/2028 1,500 MW 2026-10-06
TEAC
Archbald Mountain, PA
PPL-2025-0014
Conceptual $220 M 05/30/2028 1,000 MW 2026-02-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2025-05-06 2025-06-05
Substations named CALLENDER GAP; HOPATCONG; LACKAWANNA; PAUPACK → CALLENDER GAP; LACKAWANNA; PAUPACK 2025-06-05 2026-10-06
In-service date 05/2027 → 05/30/2028 2025-07-08 2025-09-09
In-service date 05/2027 → 05/30/2028 2025-09-09 2026-02-03

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 15
Callender Gap, PA No role wording
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27
Big Bass, PA “Build out bay #2 at Paupack 230kV yard”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 15
Callender Gap, PA No role wording
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 27
Big Bass, PA “Build out bay #2 at Paupack 230kV yard and install one new 230kV breaker, one dead-end, and ancillary equipment”
230kV
2026-02-03 TEAC
Item 07 - PPL Supplemental Projects p. 7
Archbald Mountain, PA No role wording
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 10
Big Bass, PA “Build out bay #2 at Paupack 230kV yard”
230kV
2025-06-05 TEAC
Item 05 - PPL Supplemental Projects p. 4
Callender Gap, PA No role wording
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this