Strasburg

Named in 3 PJM planning documents for 1 project, from November 6, 2024 to October 8, 2025.

Existingdescribed as
PPLzone
138kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Donnelley Gravure, PA
PPL-2024-0010 · s3547
Conceptual $117.8 M 06/01/2028 350 MW 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 27
Donnelley Gravure, PA No role wording
138kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 27
Donnelley Gravure, PA “Strasburg substation”
2024-11-06 TEAC
Item 08 - PPL Supplemental Projects p. 6
Donnelley Gravure, PA “extend two 138 kV circuits from the Lampeter 138kV yard and tie into the rebuilt Strasburg 138kV lines”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.