Niles Central

Named in 5 PJM planning documents for 2 projects, from June 13, 2025 to October 6, 2026.

Existingdescribed as
AMPTzone
138 kVkV as printed
5mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Transmission Zone M3 Process Niles Central 138 kV substation
AMPT-2025-005 · s3888.1 (AMPT) & s3888.2 (ATSI)
Engineering $14.1M 08/01/2028 63 MW 2026-10-06
TEAC
Niles Central substation
AMPT 2026-005
Not printed Not printed Not printed 60 MW 2026-06-17
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named MCDONALD STEEL; NILES; NILES CENTRAL → NILES CENTRAL Not reported Not reported
Substations named NILES CENTRAL → MCDONALD STEEL; NILES; NILES CENTRAL 2026-10-06 Not reported
Substations named NILES CENTRAL → MCDONALD STEEL; NILES; NILES CENTRAL 2025-06-13 2026-01-16
Substations named MCDONALD STEEL; NILES; NILES CENTRAL → NILES CENTRAL 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 11
AMPT Transmission Zone M3 Process Niles Central 138 kV substation “Reconfigure the existing Niles Central 138 kV station into a four (4) circuit breaker ring bus”
138 kV
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2026 RTEP p. 11
AMPT Transmission Zone M3 Process Niles Central 138 kV substation “Reconfigure the existing Niles Central 138 kV station into a four (4) circuit breaker ring bus”
138 kV
2026-06-17 SRRTEP Western
Item 01 - AMPT Supplemental Projects p. 7
Niles Central substation No role wording
2026-01-16 SRRTEP Western
Item 02 - AMPT Supplemental Projects p. 5
AMPT Transmission Zone M3 Process Niles Central 138 kV substation “Reconfigure the existing Niles Central 138 kV station into a four (4) circuit breaker ring bus”
138 kV
2025-06-13 SRRTEP Western
Item 04 - AMPT Supplemental Projects p. 5
AMPT Transmission Zone M3 Process Niles Central 138 kV substation “At AMPT's Niles Central 138 kV substation, a single breaker failure of the 138 kV tiebreaker results in the loss of all load”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.