Loughs Lane Substation
Named in 9 PJM planning documents for 5 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
11mentions
Also printed as: Loughs Lane
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Loughs Lane – Pickens 138 kV Line APS-2023-032 · s3938.1 |
Not printed | $182.84M | 11/04/2032 | Not printed | 2026-10-06 TEAC |
| Misoperation Relay Projects APS-2023-067, APS-2023-068 · s3357.1, s3358.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118 |
Not printed | Not printed | Not printed | Not printed | 2024-12-13 SRRTEP Western |
| Leadsville – Loughs Lane 138 kV Misoperation Relays APS-2024-112 · s3770.1 |
Not printed | $2.30M | 9/28/2029 | Not printed | 2026-10-06 TEAC |
| Loughs Lane - Pickens 138 kV Line APS-2025-016 |
Conceptual | $1.05M | 12/31/2026 | Not printed | 2026-01-16 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BEVERLY; BEVERLY TAP; DURBIN; DURBIN TAP; LOUGHS LANE; PICKENS → BEVERLY; DURBIN; LOUGHS LANE; PICKENS | 2026-05-15 | 2026-10-06 |
| Substations named | BEVERLY TAP; DURBIN TAP; HARDY; JUNCTION; LOUGHS LANE; PICKENS → HARDY; JUNCTION; LOUGHS LANE; PICKENS | 2024-10-08 | Not reported |
| Substations named | BEVERLY TAP; DURBIN TAP; LOUGHS LANE; PICKENS → LOUGHS LANE; PICKENS | 2025-05-16 | 2026-01-16 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 63 |
Loughs Lane – Pickens 138 kV Line | “At Loughs Lane Substation: Remove wave trap, replace disconnect switch, substation conductor, and
relaying.” 138 kV |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 8 |
Leadsville – Loughs Lane 138 kV Misoperation Relays | “Replace 138 kV circuit breaker, line tuner and coax, CVT, and relaying at Loughs Lane
Substation” 138 kV |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 63 |
Loughs Lane – Pickens 138 kV Line | “At Loughs Lane Substation: Remove wave trap” |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 8 |
Leadsville – Loughs Lane 138 kV Misoperation Relays | “relaying at Loughs Lane Substation” |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 91 |
Misoperation Relay Projects | “At Loughs Lane Substation, replace line trap, circuit breaker, disconnect switches and relaying” 138 kV |
| 2026-05-15 | SRRTEP Western Item 03 - APS Supplemental Projects p. 7 |
Loughs Lane – Pickens 138 kV Line | “At Loughs Lane Substation: Remove wave trap, replace disconnect switch, substation conductor, and relaying.” 138 kV |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 8 |
Loughs Lane - Pickens 138 kV Line | No role wording 138 kV |
| 2025-08-15 | SRRTEP Western Item 04 - APS Supplemental Projects p. 5 |
Leadsville – Loughs Lane 138 kV Misoperation Relays | “Replace 138 kV circuit breaker, line tuner and coax, CVT, and relaying at Loughs Lane Substation” 138 kV |
| 2025-05-16 | SRRTEP Western Item 06 - APS Supplemental Project p. 4 |
Loughs Lane - Pickens 138 kV Line | No role wording 138 kV |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 6 |
Misoperation Relay Projects | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 91 |
Misoperation Relay Projects | “At Loughs Lane Substation, replace line trap, circuit breaker, disconnect switches and relaying” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.