Mentions: April 2026
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2026-04-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 3 |
AEP Transmission Zone: Baseline
B3959.1 Cancellation B3959.1 |
Ironman Lick |
Status Cancellation (Cancelled) Cost $1.099M In service 06/01/2030 |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 3 |
North Washington (Kiski Valley) 138 kV Line APS-2026-008 |
Kiski Valley North Washington |
Load 18 MW |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 4 |
Saltsburg 138 kV Substation APS-2026-009 |
Saltsburg Social Hall Substation Vandergrift |
Load 11 MW |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 6 |
Hampshire - Ridgeley 138 kV Line APS-2026-011 |
Hampshire Substation Ridgeley |
No figures printed |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 8 |
French Creek - Sutton 138 kV Line APS-2026-012 |
French Creek Heaters Tap Sutton Substation |
No figures printed |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 10 |
Cabot - Saxonburg & Fawn - Silverville 138 kV Lines APS-2026-013 |
Cabot Fawn Saxonburg Silverville |
Load 15.5 MW |
| 2026-04-15 | SRRTEP Western Item 02 - APS Supplemental Project p. 12 |
North Shenandoah – Page 138 kV Line APS-2024-085 |
North Shenandoah Substation Page |
Status Conceptual Cost $4.06M In service 06/01/2029 |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 3 |
Aurora-Chamberlin No. 1 69 kV Line ATSI-2026-025 |
Aurora Cantex Chamberlin Treat Verizon |
Load 120 MWs |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 5 |
Chrysler - Maclean 138 kV Line ATSI-2026-026 |
Chrysler Substation Maclean |
Load 54 MW |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 7 |
London-Tangy 69 kV Line ATSI-2026-028 |
Darby Deer London Tangy |
No figures printed |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 9 |
Bryan - Snyder 69 kV line ATSI-2026-030 |
Bryan East Fayette Snyder Stryker |
Load 72 MW |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 12 |
Nursery Substation 138 kV ATSI-2025-003 |
Grand River Leroy Center Nursery Substation |
Status Conceptual Cost $25.58M In service 04/28/2028 Load 135 MW |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 15 |
Rockaway Substation 69 kV ATSI-2025-038 |
OS Kelly Rockaway Substation Springfield Medical |
Status Conceptual Cost $3.43M In service 06/22/2028 |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 17 |
Chrysler Substation ATSI-2025-039 |
Chrysler Substation First Solar Shelby |
Status Conceptual Cost $2.76M In service 12/31/2028 |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 19 |
Crestline 69 kV Capacitor ATSI-2026-003 |
Crestline Station Leaside Stevens |
Status Conceptual Cost $0.44M In service 04/16/2027 |
| 2026-04-15 | SRRTEP Western Item 03 - ATSI Supplemental Project p. 21 |
Pemberville Station ATSI-2026-013 |
Bowling Green No. 4 Maclean Pemberville Station |
Status Conceptual Cost $3.46M In service 12/31/2027 |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 3 |
Heath, OH AEP-2024-OH037 |
Heath | In service 12/01/2027 Load 300 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 5 |
Bixby, OH AEP-2026-OH002 |
None named | In service Q2 2028 Load 43.2MWs |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 6 |
Anguin, OH AEP-2026-OH012 |
None named | In service 06/01/2030 Load 244 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 7 |
Jug Street, OH AEP-2026-OH013 |
Fiesta | Load 50 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 8 |
West Hebron, OH AEP-2026-OH014 |
Peach | Load 50 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 9 |
Sifford, OH AEP-2026-OH016 |
Sifford | In service January 2031 Load 280 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 10 |
Beatty, OH AEP-2026-OH017 |
Cyprus | In service Q1 2031 Load 675 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 11 |
Jug Street, OH AEP-2026-OH018 |
Tasjan | Load 216 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 12 |
Tiffin Center, OH/Melmore, OH AEP-2026-OH020 |
Melmore Tiffin Center |
In service October 2027 Load ~1.5 MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 13 |
Stone, KY/Tom Watkins, KY/Coleman, KY AEP-2026-AP003 |
Coleman Stone Tom Watkins |
No figures printed |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 15 |
South East Canton, OH AEP-2025-OH020 |
South Canton Southeast Canton Sunnyside Timken Timken Richville Torrey Vettel New |
Status Engineering Cost $31.766 M In service 01/07/2028 Load 312MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 17 |
Canton Central, OH AEP-2025-OH021 |
Canton Central Tidd Triton New Wagenhals |
Status Engineering Cost $21.961 M In service 01/08/2028 Load 300MW |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 19 |
Auglaize County, OH AEP-2022-OH022 |
Kossuth North Delphos South Kossuth West Moulton |
Status Engineering Cost $23.396 M In service 08/15/2029 |
| 2026-04-15 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 3 |
Wempletown ComEd-2026-007 |
Wempletown | No figures printed |
| 2026-04-15 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 5 |
Sabrooke 138KV CBs ComEd-2026-003 |
Pierpont Tap Sabrooke |
Status Conceptual Cost $3.75M In service 12/31/2027 |
| 2026-04-15 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 7 |
Rockwell 138KV CB ComEd-2026-004 |
Rockwell | Status Conceptual Cost $2M In service 12/31/2027 |
| 2026-04-15 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 3 |
Mt. Healthy Substation Rebuild DEOK-2026-002 |
Finneytown Mapleknoll Mt. Healthy |
No figures printed |
| 2026-04-15 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 4 |
Maud Substation Conversion DEOK-2026-003 |
Allen Liberty Maud |
No figures printed |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 3 |
Cozy Lake - Franklin 34.5 kV S747 Line JCPL-2026-013 |
Cozy Lake Franklin |
No figures printed |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 4 |
Montville - Whippany 34.5 kV D4 Line JCPL-2026-014 |
Montville Whippany |
No figures printed |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 3 |
PPL-2019-006 | None named | Status Conceptual Cost $31M In service 12/31/2028 |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 6 |
North Hampton, PA PPL-2026-0015 |
None named | Load 100 MW |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 7 |
South Allentown, PA PPL-2026-0033 |
South Allentown | In service 11/30/2026 |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 8 |
Quarry, PA PPL-2026-0034 |
None named | No figures printed |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 10 |
Allenwood, PA PPL-2026-0016 |
None named | Status Conceptual Cost $3.25 M In service 07/31/2027 Load 60MW |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 12 |
Tinker, PA PPL-2026-0017 |
Elk Mountain Greenfield Tinker |
Status Conceptual Cost $34.6 M In service 11/30/2029 |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 14 |
Yard Sullivan, PA PPL-2026-0020 |
Sullivan Trail | Status Conceptual Cost $1 M In service 02/01/2027 |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 16 |
Bingen, PA PPL-2026-0024 |
Bingen | Status Conceptual Cost $0.6 M In service 11/30/2027 |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 04 - PECO Supplemental Projects p. 3 |
PE-2026-011 | Crescentville Waneeta |
No figures printed |
| 2026-04-14 | SRRTEP Mid-Atlantic Item 04 - PECO Supplemental Projects p. 5 |
PE-2026-004 | Crescentville Waneeta |
Status Construction (Under construction) Cost $325k In service 5/3/2026 |
| 2026-04-14 | SRRTEP Southern Item 01 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2025-0089 |
Davis H&RP H&RP and Davis Substations |
Load 30 MW |
| 2026-04-14 | SRRTEP Southern Item 01 - DOM Supplemental Projects p. 4 |
Equipment Material Condition, Performance and Risk DOM-2025-0095 |
Davis | No figures printed |
| 2026-04-14 | SRRTEP Southern Item 01 - DOM Supplemental Projects p. 5 |
Equipment Material Condition, Performance Risk DOM-2026-0017 |
Chancellor Chase City Lancaster Virginia Beach Watkins Corner |
No figures printed |
| 2026-04-07 | TEAC Item 03 - APS Supplemental Projects p. 3 |
Carroll - Mount Airy 230 kV line APS-2023-058 |
Carroll Mount Airy Mt. Airy |
Status Conceptual Cost $50M In service 06/30/2029 |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 3 |
Beacon, OH AEP-2026-OH007 |
None named | Load 310 MW |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 4 |
Green Chapel, OH AEP-2026-OH009 |
None named | In service 06/01/2030 Load 415 MW |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 5 |
Vassell, OH AEP-2026-OH010 |
None named | In service 06/01/2030 Load 787 MW |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 6 |
Corridor, OH AEP-2026-OH011 |
None named | In service 06/01/2030 Load 429 MW |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 7 |
Bixby, OH AEP-2026-OH015 |
None named | In service fall of 2030 Load 358 MW |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 8 |
Corridor, OH AEP-2026-OH019 |
Curleys | Load 638 MW |
| 2026-04-07 | TEAC Item 04 - AEP Supplemental Projects p. 10 |
Don Marquis, OH AEP-2026-OH004 |
Don Marquis Marquis station Monza New |
Status Scoping (Conceptual) Cost $156.6 M In service 12/31/2027 Load 800 MW |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 3 |
Hummelstown, PA PPL-2026-0022 |
Hummelstown | No figures printed |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 4 |
Jenkins, PA PPL-2026-0023 |
Jenkins | No figures printed |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 5 |
Hosensack, PA PPL-2026-0027 |
Hosensack | No figures printed |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 6 |
Steel City, PA PPL-2026-0028 |
Steel City | No figures printed |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 7 |
Fisherdale, PA PPL-2026-0029 |
None named | In service 06/2028 Load 2,000 MW |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 8 |
Winton, PA PPL-2026-0030 |
None named | In service 06/2028 Load 300 MW |
| 2026-04-07 | TEAC Item 05 - PPL Supplemental Projects p. 9 |
Elimsport, PA PPL-2026-0031 |
None named | In service 06/2028 Load 300 MW |
| 2026-04-07 | TEAC Item 06 - ComEd Supplemental Projects p. 3 |
LaSalle 345KV CB ComEd-2026-005 |
LaSalle | No figures printed |
| 2026-04-07 | TEAC Item 06 - ComEd Supplemental Projects p. 4 |
Nelson 345KV CB ComEd-2026-006 |
Nelson | No figures printed |
| 2026-04-07 | TEAC Item 07 - PEPCO Supplemental Projects p. 3 |
PEP-2026-001 | Burches Hill Palmer Corner Palmers Corner |
Status Engineering Cost $0.5M In service 5/17/2026 |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 3 |
PE-2026-007 | Whitpain | No figures printed |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 4 |
PE-2026-008 | Whitpain | No figures printed |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 5 |
PE-2026-010 | Plymouth Meeting Whitpain |
No figures printed |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 6 |
PE-2026-006 | Cromby | No figures printed |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 8 |
New Limerick TR 7 500/230 kV Transformer PE-2026-005 |
Limerick | Status Engineering Cost $93 M In service 06/01/32 |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 10 |
Navy Yard-Richmond New 230kV Line PE-2025-008 |
Bellwether New Chichester Claymont Edgemoor Elmwood Grays Ferry Island Road Linwood Navy Yard Plymouth Meeting Richmond Trainer Whitpain |
Status Engineering In service Phase 1 – 12/31/2029, Phase 2 – 6/1/2031 Load 500 MW |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental
Operational Flexibility and Efficiency DOM-2025-0100 |
Darbytown Northeast Techpark Place |
No figures printed |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2026-0015 |
Simms New | In service 12/01/2029 Load 296MW |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental
Equipment Material Condition, Performance Risk DOM-2026-0016 |
Clifton Greenwich Jefferson Street Lanexa Liberty Newport News Pleasant View Valley |
No figures printed |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 6 |
Dominion Transmission Zone: Supplemental
Equipment Material Condition, Performance and Risk DOM-2025-0086 |
Clarendon Glen Carlyn |
Load 90 MW |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental
Equipment Material Condition, Performance and Risk DOM-2025-0088 |
Crystal Davis Glebe |
Load 120 MW |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 9 |
Dominion Transmission Zone: Supplemental
Auto World 230kV Delivery - DEV DOM-2023-0031 |
Auto World New Golden Paragon Park Sterling Park |
Status Conceptual Cost $31.8 M In service 12/17/2027 Load 282.6 MW |
| 2026-04-07 | TEAC Item 09 - DOM Supplemental Projects p. 11 |
Dominion Transmission Zone: Supplemental
Firehouse 230kV Delivery - DEV DOM-2024-0016 |
Beco Firehouse New Paragon |
Status Engineering Cost $64.3 M In service 12/31/2030 Load 234 MW |
| 2026-04-07 | TEAC Item 11 - Reliability Analysis Update p. 7 |
AEP and DOM P5 CAPs: Baseline b4077 |
None named | In service 4/15/2030 |
| 2026-04-07 | TEAC Item 11 - Reliability Analysis Update p. 9 |
AEP and DOM P5 CAPs: Baseline | None named | In service 4/15/2030 |
| 2026-04-07 | TEAC Item 11 - Reliability Analysis Update p. 11 |
PPL Transmission Zone: Baseline b3774 |
Brunner Island Yorkana Yorkanna |
Cost $4.3M In service 6/1/2027 |
| 2026-04-07 | TEAC Item 11 - Reliability Analysis Update p. 12 |
Dominion Transmission Zone: Baseline New 765/500/230kV Yeat Substation B4000.355 – B4000.359 |
Bristers Culpeper Yeat New Cunningham Elk Run Elmont Joshua Falls Kraken New Meadowbrook Midlothian Morrisville Mosby Nokesville North Anna Possum Pt Spotsylvania Vint Hill Vontay New Wishing Star Yeat New |
Cost $1,109.89M In service 6/1/2029 |
| 2026-04-07 | TEAC Item 11 - Reliability Analysis Update p. 18 |
Dominion Transmission Zone: Baseline Second Chickahominy 500/230kV Transformer b3213 |
Chesterfield Chickahominy Elmont Lanexa Surry |
Cost $34.03M In service 6/1/2023 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.