Steel City

Named in 4 PJM planning documents for 1 project, from April 7, 2026 to October 6, 2026.

Existingdescribed as
PPLzone
500kVkV as printed
4mentions

PJM interconnection queue

A PJM queue substation page has the same name: Steel City (PA) — 3 queue requests filed, 1 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Steel City 500kV Switchyard
PPL-2026-0028
Conceptual $3 M 11/30/2029 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 67
Steel City 500kV Switchyard “Upgrade the Steel City 500kV Switchyard to a BAAH configuration”
500kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 66
Steel City 500kV Switchyard “Upgrade the Steel City 500kV Switchyard to a BAAH configuration”
500kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 22
Steel City 500kV Switchyard “Upgrade the Steel City 500kV Switchyard to a BAAH configuration”
500kV
2026-04-07 TEAC
Item 05 - PPL Supplemental Projects p. 6
Steel City 500kV Switchyard “The current arrangement at Steel City 500kV is built for BAAH but operated as a ring bus.”
500kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.